Laserfiche WebLink
Attachment number 1 \n <br />G -3 Page 196 <br />CHANGE ORDER PROPOSAL BREAKDOWN <br />NIWI?SAL STEEL of NC LLC JOB_ NAME: Royal Oaks Elementary School <br />630 Bassett Dr THOMASVILLEE, NC JOB NUMBER: 1607 <br />PH: 336 -476 -3105 FAX.' 336 - 476 -8995 CONTRACTOR: Edison Foard <br />DATE May 24, 2016 <br />DESCRIPTION OF WORK: <br />CHANGE PROPOSAL <br />/ CP -01 <br />REFER TO: <br />JOB TAXED <br />7.00% <br />P <br />WP <br />PR9IAA <br />SHOP <br />Changes due to PCO#1 Addenda 4-release. <br />V <br />t <br />k STEEL «. .. <br />LABOR HOURS: RATEPER HR. <br />REGULAR 30 $ 60.00 Addltlo I stru tural fabrication required. <br />TO At COS T. <br />$ 1,800.00 <br />OVERTIME <br />0 <br />$ 68.00 <br />$ <br />DETAILING LABOR <br />HOURS: <br />RATE/HR. <br />DESCRIPTION: <br />TOTAL COST. <br />STRUCT. PER / L8. <br />30 <br />$ : ' 0.00 <br />Additional detailin to previously completed drawings.- <br />$ 2,100.00 <br />ENGINEERING <br />17.5 <br />$ 85.00 <br />Additional engineering of connections for changed loadln <br />. <br />$ 1,487.50 <br />ADDITIONAL COSTS <br />UNIT <br />ATE <br />DESCRIPTION: <br />TOTAL COST- <br />1. <br />PAINTING (PER/ TON) <br />15 <br />$ 25.00 <br />Painting of additio or changed steel. <br />$ 375.00 <br />2. <br />GALVANIZING (PER./ LB. <br />0 <br />0 <br />- -- <br />3. <br />FREIGHT <br />1 <br />650.00 <br />Shipping for addificnai steel. <br />$ 650.00 <br />4. <br />JOIST & MISC, <br />1 <br />2, 040.00 <br />Joist added. <br />$ 2,040.00 <br />5. <br />DECK & MISC. <br />1 <br />$ 400.00 <br />Deck added. <br />$ 400.00 <br />6. <br />BUYOUTS <br />0 <br />$ <br />$ - <br />DESCRIPTION OF MAT'L. <br />UNIT PRICE <br />QUANT. <br />FASTENERS= = = = = == <br />Structural steel fasteners added. <br />$ 3 -00 <br />292 <br />$ 878.00 <br />1. <br />A36/A50 STEEL <br />Raw structural steel material added. <br />_ _ <br />$ 0.85 <br />423 <br />$ 359.55 <br />2. <br />TUBE <br />$ 1.10 <br />0 <br />$ <br />3. <br />PIPE <br />$ <br />.. <br />0 <br />0. <br />$ _ <br />$ - <br />4. <br />ROLLED MATERIAL <br />_ 1. 05 <br />$ , .4C <br />5. <br />MISC. ITEMS <br />$ - <br />p <br />$ <br />6. <br />MISC, ITEMS <br />$ <br />- <br />p <br />$ <br />f�I1SSZE k"" ..t �, ,yy p <br />ra .aeY9F•`'1 �rJ±"'., S�.:i`:: <br />SHOP LABOR HOURS: RATE/PER HR, I DESCRIPTION: <br />TOTAL COST.• <br />REGULAR <br />200 <br />$ 60.00 <br />Added stair and railing fabrication by misc. fabricator. <br />$ 12,000.00 <br />OVERTIME <br />0 <br />$ 68.00 <br />$ <br />DETAILING <br />LABOR <br />HOURS: <br />RATE/PER I.B. <br />DESCRIPTION: <br />TOTAL COST. <br />MISC. PER / LB. <br />40 <br />$ 70.00 <br />Detailing for tho addition stair and railing. <br />$ 2,800.00 <br />ENGINEERING <br />16 <br />$ 85.00 <br />_ _ <br />Engineering for the additional stair. <br />$ 1,360.00 <br />ADDITIONAL COSTS <br />UNIT <br />RATE DESCRIPTION: <br />TOTAL COST. <br />1. <br />PAINTING (PER/ TON <br />11 <br />$ 25.00 ! Painting of additional steel stair and railing <br />$ 275.00 <br />2. <br />GALVANIZING PER: / LB. <br />0 _ _ <br />- $ - 0.60 ; <br />$ - <br />3. <br />FREIGHT <br />1 <br />$ 650.00 Shipping for the additional stair and rallin <br />4. <br />$ 650.00 <br />DESCRIPTION OF MAT L. <br />UNIT PRICE <br />QUANT. <br />FASTENERS= = === == <br />Fasteners for the additional stair. <br />$ 3.00 <br />100 <br />$ 300.00 <br />1. <br />A36 / A50 STEEL <br />Raw material for the additional stair. <br />$ 0.85 <br />8500 <br />$ 7,225.00 <br />2. <br />TUBE <br />$ 1.10 <br />0 <br />S - <br />3. <br />PIPE <br />Raw material for the additional railing, <br />$ 1.05 <br />2040 <br />$ 2,142.00 <br />4. <br />ROLLED MATERIAL <br />$ 1.40 <br />0 <br />$ - <br />TAX 1 7.00% <br />FABRICATION SUB-TOTAL-- - <br />$ 979.48 <br />$ 37,819.53 <br />Cwdl -d on onon 2 <br />Attachment number 1 \n <br />G -3 Page 196 <br />