My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2016 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2016
>
AG 2016 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 3:37:35 PM
Creation date
11/27/2017 10:34:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/2016
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
See below in yellow. Westley, I need a real quick turn - around on this response (before the end of this week). I am on vacation <br />next week, so I need to get to the A/E for final review this week, as they need to review and approve next week so that the <br />r 'ng can go to the school board the following week. Also, you might need to include a copy of your pricing from the detailer, <br />a- _,iey are questioning that number as well. <br />Thanks, <br />David <br />From: Nally, Stephen [mailto:snally moseleyarchitects com <br />Sent: Wednesday, June 22, 2016 2:20 PM <br />To: David Pofahl; Jerry Anderson; Bielicki, Paul <br />Subject: Fwd: ROES - PCO #001 <br />Sent from my Whone <br />Begin forwarded message: <br />From: "Jobe, Chris" < ciobe(a.moseleyarchitects com <br />Date: June 22, 2016 at 10:46:09 AM EDT <br />To: "Nally, Stephen" < snallyna,moseleyarchitects com >, "Cooke, Steven" <br />< scooke(a,moseleyarchitects com <br />Subject: FW: ROES - PCO #001 <br />Stephen & Steven: <br />The structural steel sub contractor, Universal Steel, did not provide us with an adequate itemized break <br />down of the materials. Some structural steel material was added and the framing bays were adjusted for <br />the new stair. However, we did eliminate some brace frames and structural steel members. I believe <br />they should provide us with a better description including the size of members with lengths of the <br />materials added and credits. It appears the majority of the steel cost associated with their change order <br />proposal is for the stairs. Also, $3587.50 to redo the shop drawings. <br />The concrete portion appears to be appropriate for the work. <br />Masonry sub, Seagraves, did not provide us with an adequate itemized break down of the materials. I <br />believe they should provide us with a better description of the materials added with lengths and heights. <br />Chris Jobe, P.E. <br />Senior Structural Engineer <br />MOSELEY ARCHITECTS <br />- - - -- Original Message---- - <br />From: Cooke, Steven <br />Sent: Monday, June 20, 2016 11:20 AM <br />To: Jobe, Chris <br />Subject: FW: ROES - PCO #001 <br />Attachment number 1 \n <br />G -3 Page 203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.