Laserfiche WebLink
ay <br />iceveriCSI[ 3? <br />� nnstrurkfzyn <br />5rervfcesr, LLC I N .- <br />1 <br />commercial Construction, Osrolopment b ttoeoretlon <br />Project: Royal Oaks Elementary School Replacement <br />608 Dakota Street <br />Kannapolls, NC 28083 <br />Change Request. #1 <br />Contract Duration will be Increased: 4 Days <br />Date: 611/16 <br />General Contractor: <br />Edison Foard Construction Company <br />Subcontractor: <br />Maverick Construction Services, LLC <br />Description: <br />Referencing Post Bid Addendum #4 revised drawings dated 3111116, add metal - framed / <br />gypsum board partition walls at Stairs ST3 (Area D Lower), Stairs ST3 (Area D Upper) <br />and Teacher Center E110. Add 1 -HR rated ceiling at Stairs ST3. install new <br />doorframes ST3A, ST313 and ST3C furnished by others. Note: Pricing for work <br />described herein is only good if completed in conjunction with base contract work, not <br />after, Excludes, wood blocking, acoustical caulking, fire safing, fire caulking, sealing <br />around wall and /or ceiling penetrations, expansion joints, expansion joint covers, etc. <br />QTY. <br />MATERIALS <br />UNIT <br />RATE <br />TOTAL <br />REG. <br />MRS. <br />O.T. <br />HRS. <br />LABOR <br />REG. <br />RATE <br />O.T. <br />RATE <br />TOTAL <br />70 <br />3 5/8" 20 Ga, 2" Slot Track <br />1.354 <br />$95 <br />48 <br />Framer <br />$22.00 <br />$1 <br />70 <br />3 5/8" 20 Ga. Req Track <br />0.403 <br />28 <br />8 <br />Insulator <br />$18.00 <br />144 <br />1920 <br />3 5/8" 20 Ga. Stud <br />0.409 <br />$785 <br />64 <br />Hanger <br />$20.00 <br />$1,280 <br />30 <br />6" 20 Ga. 2 112" Slot Track <br />1.719 <br />$52 <br />80 <br />lFinisher <br />20.00 <br />$1,600 <br />100 <br />6'2D Ga. 2" Deep Track <br />0.588 <br />59 <br />4 <br />Cleanup <br />$15.00 <br />$60 <br />50 <br />W20 Ga. Reg. Track <br />0.558 <br />8 <br />2 <br />La out <br />$28.00 <br />$56 <br />800 <br />6" 20 Ga. Stud <br />0.565 <br />$452 <br />$o <br />528 <br />11 112" 16 Ga. CRC <br />0.493 <br />$260 <br />$p <br />480 <br />3 518" Bridge Clip <br />0.880 <br />5422 <br />so <br />224 <br />6" Bridge Cii <br />1.380 <br />$309 <br />$0 <br />4440 <br />5/8" T e "X" GB <br />0.328 <br />$1,456 <br />$0 <br />2240 <br />R11 x 16" Unfaced Insu!. <br />0.254 <br />$569 <br />$0 <br />480 <br />R19 x 16" Unlaced instil. <br />0.385 <br />$185 <br />$ <br />1 <br />Mud Tape, Bead Fasteners <br />783.00 <br />$783 <br />$0 <br />SUBTOTAL $5,483 <br />UAL.ES TAX (7 %) $364 <br />MATERIALS SUBTOTAL $5,867 <br />SUBTOTAL <br />LABOR BURDEN (32 %) <br />LABOR SUBTOTAL <br />MATERIALS SUBTOTAL <br />LABOR SUBTOTAL <br />EQUIPMENT SUBTOTAL <br />SUBTOTAL <br />OVERHEAD & PROFIT (15 %) <br />SUBTOTAL <br />GENERAL LIABILITY INSURANCE (.96 %) <br />TOTAL <br />$4.196 <br />$1,343 <br />$5,539 <br />QTY. <br />EQUIP. RENTAL / ENG. <br />SERVICES <br />UNIT <br />RATE <br />TOTAL <br />1 <br />Scaffolding Stairs ST3 <br />2975.00 <br />$2,975 <br />$5,867 <br />$ <br />$5,539 <br />$0 <br />$3,183 <br />$ <br />$14,589 <br />$0 <br />$2,188 <br />$0 <br />$16 <br />$0 <br />$159 <br />$a <br />$15, 936 <br />SUBTOTAL <br />SALES TAX (7 %) <br />EQUIPMENT SUBTOTAL <br />$2 <br />Prepared By: Michael Goodo!ie / Owner <br />$208 <br />$3,163 <br />Attachment number 1 \ <br />G -3 Page 207 <br />