My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2016 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2016
>
AG 2016 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 3:37:35 PM
Creation date
11/27/2017 10:34:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/2016
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� <br />.S." Vj Irp <br />r— ATAW E 3 A, M C H A N I C A L <br />I <br />CHANGE ORDER REQUEST <br />PROJECT: Royal Oaks Elementary School <br />CONTRACTOR: Edifice, Inc. <br />DESCRIPTION OF CHANGE: <br />PCO 001 Drawings <br />5/20/2016 <br />COR ft: I <br />PROJECT #: HC111-EFC <br />Mechanical Contractor Labor <br />hrs. rate ($) <br />5. Labor: Superintendert <br />0 40 <br />5. Labor: Foreman <br />Werhanlecd Contractor Materlals <br />1. Materials: Ductwork <br />$ <br />1,740.00 <br />1. Materlals: Pipe <br />$ <br />610.00 <br />2. Materials: (6) Additional fire dampers <br />$ <br />825.00 <br />Ia. Subtotal - Materials <br />$ <br />3,175.00 <br />2. Sales Tax (7.0%) <br />$ <br />222,25 <br />3. Subtotal (Materlals w/ Taxi <br />3,397.25 <br />4. Gross Profit (includes overhead & prof t) <br />ICA% $ <br />3,774.72 <br />.-T <br />Mechanical Contractor Labor <br />hrs. rate ($) <br />5. Labor: Superintendert <br />0 40 <br />5. Labor: Foreman <br />34 <br />5. Labor: Mechanics <br />24 <br />Sa. Subtotal Labor <br />$ <br />IC. Subcontractor: <br />3,672.00 <br />6. Payroll Taxes, Insurance & Benefits <br />0% <br />11. Cross Profit (Includes overhead and profit) <br />$ <br />7, Gross Profit (includes cverh ead and profit) <br />10,0094 <br />ISUBTOTAL OF CHANCE ORDER <br />4,080.00 <br />– 12. Bonds <br />$ <br />Mechanical Contractor Eoulpmen hrs rate <br />8. Equipment: Add (6) Fire Dampers 2 <br />8: Equipment: OL <br />8: Equipment: 01 <br />8 a: S u b tota l - Equipment 690.00 <br />9. Gross Profit (Includes overhead and profit) 755S6 <br />z <br />SSubcontractors 10. Subcortractor: Test & Balance <br />10. Subcontractor: <br />$ <br />IC. Subcontractor: <br />$ <br />10a. Subtotal - Subcontractors <br />$ <br />11. Cross Profit (Includes overhead and profit) <br />$ <br />$ <br />ISUBTOTAL OF CHANCE ORDER <br />$ 6 – 2 8 <br />– 12. Bonds <br />$ <br />Additional Days Requested: <br />0 <br />Attachment number 1 \n <br />G-3 Page 208 <br />341 <br />$ <br />0 <br />ol <br />$ <br />01 <br />$ <br />0 <br />Attachment number 1 \n <br />G-3 Page 208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.