My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2016 10 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2016
>
AG 2016 10 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 11:49:10 AM
Creation date
11/27/2017 10:35:17 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/17/2016
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 21, 2016 <br />Pam and Jonathan, <br />Architect Design Contract <br />The Cabarrus County School Board voted last Monday night to award the Architectural Design Contract <br />to LS3P pending funding from the County Commissioners. The Board selected LS3P Associates (LS3P) for <br />the project at the August 8, 2016 business meeting. Staff has negotiated a contract with LS3P and <br />believes the fee amount to be fair and reasonable. The base fee is 5.3% of the construction budget, or <br />$2,915,000. Additionally, a $15,000 reimbursables allowance, a $16,000 Traffic Impact Analysis <br />allowance, a $30,000 allowance for off -site design work for the road improvements and signal design for <br />Weddington Road (at the site) along with the circulation improvements for Weddington Hills <br />Elementary /Winkler Middle and a $40,000 allowance should the project be required to widen <br />Weddington Road to George Liles Blvd. are included in the contract. The total fee, to include the <br />allowances comes to $3,016,000. The contract is broken into several different payment phases which <br />we believe will translate to a scheduled payment limit of approximately $250,000 for design services and <br />$16,000 for a Traffic Impact Analysis to be paid by February, 2017; the balance of the design fee to be <br />paid in monthly draws by about June, 2017, and the construction administration phase will run to the <br />end of the project. We are requesting that the County Commission consider utilizing the contingency <br />funds for the Odell Elementary School Project to fund the first phase of this project. <br />Odell 3 -5 Contingency - Held at County 344,917 <br />New High School - Architecture 344,917 <br />Funds held in contingency for Odell 3 -5 will not be needed on the Odell project. Funds can be <br />transferred to new high school per internal conversations among county and schools. <br />Phase 1 250,000 <br />Traffic Impact Analysis Weddington Road 16,000 <br />Expanded TIA if required to include George Lyles Parkway 40,000 <br />306,000 <br />If you could please add this as an Agenda Item for your October 3, 2016 work session, we would <br />appreciate it. With the emphasis of time it would be advantageous to have this voted upon at the <br />Commissioners work session on October 3rd <br />Thank you, <br />G. Tim Lowder, PE <br />Executive Director of Operations <br />Attachment number 1 \n <br />F -1 Page 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.