My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 03 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 03 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2013 2:42:52 PM
Creation date
11/27/2017 10:56:15 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/18/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Does your bid comply? Yes _X_ No <br />Drip Rails <br />In addition to the drip rail found in the roof extrusion there shall be a drip rail provided over each exterior <br />compartment door. These lower drip rails shall be attached in such a manner to provide quick and easy <br />replacement in the event they are damaged. They shall not be riveted or welded to the doorframe extrusion. <br />Does your bid comply? Yes _X_ No <br />Sub floor Structure <br />The sub floor structure of the modular body shall be constructed of 2" x 2" x.125" structural tubing. There <br />shall be two (2) longitudinal and twelve (12) lateral tubes welded together to form a sub floor structure. The <br />floor structure shall be designed to provide strength while conforming to chassis component clearance <br />requirements and to provide appropriate locations for body mounting devices. Sufficient structure for <br />maximum support and the safe installation of cot mount hardware, or other floor- mounted devices, will be <br />integral to the sub floor structure. The sub floor structure shall include a 4" x 5" x .250" tube of 6061 -T6 alloy <br />as an "in- frame" pass through for the OEM fuel filler and DEF filler necks. Routing under the sub -floor frame or <br />frame trimming to accommodate the fuel fill hose is not acceptable to the Purchaser and will not be accepted. <br />Does your bid comply? Yes _X_ No <br />Body Mounting <br />The modular body shall be mounted to the chassis frame at the ten (10) points provided by the OEM chassis <br />manufacturer. For consistency of materials, compliance with the chassis manufacturer's second unit body <br />mounting requirements and to facilitate future remounting of the body, only OEM supplied mounting <br />hardware shall be used. Methods of body to chassis mounting that do not match the OEM cab mounting <br />process will not be considered due to the stresses created by difference in flexibility between the cab and the <br />modular body. The mounting hardware shall consist of ten (10) 1/2" thick by 6" wide aluminum plates of <br />6061 -T6 alloy welded to the underside of the structural floor to provide puck mounting locations <br />corresponding to the mounting points on the OEM frame rails. <br />The mounting system must be designed so the mounting bolts can be removed during a remount without <br />having to cut the bolts. Drawings shall be furnished to show the mounting system on the unit being bid. <br />40 <br />Attachment number 1 <br />F -2 Page 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.