My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 08 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 08 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2013 4:47:42 PM
Creation date
11/27/2017 10:59:19 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
8/19/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OF MIDLAND <br />PO Box 589 • 4293 -B Hwy. 24/27 E • Midland, NC 28107 <br />Town Office: 704 - 888 -2232 • Town Fax: 704 - 888 -2234 <br />townofmidland @midlandnc.us • www.townofmidland.us <br />Dear Mayor Padgett and the Concord City Council, <br />On behalf of the Midland Town Council, I am writing to request the City of Concord to formally bring the <br />following request to the Water and Sewer Authority of Cabarrus County (WSACC) Board at their August <br />15 annual meeting: <br />Request: In order to extend sewer services into areas of environmental need and to ensure the <br />adequacy of system expansion for future needs, in accordance with the long range plans adopted by <br />WSACC, that WSACC participate in the upsizing of the gravity sewer line for Midland's Cabarrus Acres <br />Phase 1 sewer project. The gravity line will be a WSACC owned and operated 15 inch diameter <br />minimum line (with an 18 inch add alternate) identified as Cabarrus Acres Muddy Creek Interceptor 1 <br />(CAMCI 1). The Town of Midland agrees to pay an acceleration fee for the line by participating in <br />funding equal to the following: 1. Midland will provide the cost of 100% of the necessary surveying, <br />easement acquisition and design engineering, and 2. Midland will provide 25% of the construction <br />cost. <br />Background <br />The Concord - Midland Interlocal agreement was adopted by both municipalities in the Fall of 2012. Per <br />the agreement, the Town of Midland may provide the funds and /or regulatory action that expands the <br />sewer system in the Midland jurisdiction. When those projects are completed, the lines are turned over <br />to the City of Concord to own and operate unless the lines are funded by loan monies in which case <br />Midland owns the lines for the duration of the loan collateralization and then the Town turns the lines <br />over to the City of Concord. <br />One of the first projects since the Interlocal Agreement is Cabarrus Acres Phase 1 sewer project. Initial <br />drafts of the project included a pump station, which is not ideal. However, in working with the project <br />engineers, McGill Associates, Concord and WSACC staff, Midland has found an option that would avoid <br />the pump station in the Cabarrus Acres Phase 1 sewer project and use a gravity interceptor sewer line. <br />The interceptor sewer line would run along Muddy Creek to the WSACC main trunk line. The potential <br />gravity line has been identified as Cabarrus Acres Muddy Creek Interceptor 1 (CAMCI 1). CAMCI 1's <br />course goes across the future Wallace Park property owned by Cabarrus County. Because this line <br />serves multiple public purposes, WSACC staff is comfortable recommending to the WSACC Board that <br />the gravity line be a WSACC owned and operated line. Since the line would serve multiple public <br />purposes, WSACC staff recommends that the line is upgraded from an flinch to a 15 inch line with an 18 <br />inch add alternate included in bid documents. <br />The CAMCI 1 line is actually already identified in WSACC's Southern and Eastern Area Wastewater Study <br />by Arcadis in 2005. Since the line construction would occur earlier than anticipated, WSACC staff <br />Attachment number 1 <br />G -4 Page 182 <br />
The URL can be used to link to this page
Your browser does not support the video tag.