My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 08 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 08 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2013 4:47:42 PM
Creation date
11/27/2017 10:59:19 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
8/19/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OF MIDLAND <br />PO Box 589 • 4293 -B Hwy. 24/27 E • Midland, NC 28107 <br />Town Office: 704 - 888 -2232 • Town Fax: 704 - 888 -2234 <br />townofmidland @midlandnc.us • www.townofmidland.us <br />suggests Midland pay an acceleration fee as part of the line project cost. WSACC staff is comfortable <br />recommending to the WSACC board that Midland pay 100% of the survey, acquisition and design <br />engineering cost, and 25% of the CAMCI 1 line construction cost. Based on the engineer's preliminary <br />estimates of $587,000 for the 18 inch line alternative, Midland would pay $55,000 in survey and design <br />engineering costs and (25 %) in construction costs. <br />The Midland Town Council recognizes the cost savings in the project for the Town and is extremely <br />grateful for the staffs of all entities working together to assist in this matter. We are also hopeful that <br />the City of Concord and WSACC boards can help us in moving this forward and is thankful it is being <br />considered. <br />Mindful of the savings cost saving, the Town of Midland staff has made another find in examining <br />beyond the boundaries of the Cabarrus Acres sewer project. Cabarrus Acres Phase 2 offers the <br />possibility to eliminate another pump station owned and operated by the City of Concord. This involves <br />extending a gravity sewer line up to and across Midland Road to Bethel Elementary School, which is <br />currently served by a pump station. The cost savings through WSACC's participation in CAMCI 1 during <br />Phase 1 of Cabarrus Acres, could be applied to the Midland Road gravity sewer extension for Phase 2 of <br />the Cabarrus Acres project, eliminating the burden of the existing Midland Road pump station. <br />Thank you for considering Council's request. If there are any questions, please feel free to contact me at <br />704 - 425 -0729 OR Midland Town staff at 704 - 888 -2232. <br />Sincerely, <br />Kathy Kitts, Mayor <br />Town of Midland <br />CC: Coleman Keeter, Director, WSACC <br />CC: Brian Hiatt, Manager, City of Concord <br />Attachment number 1 <br />G -4 Page 183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.