My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2013 09 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2013
>
AG 2013 09 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2013 11:57:06 AM
Creation date
11/27/2017 11:01:51 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/16/2013
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County Zoning Ordinance <br />Chapter 12- Administration and Enforcement <br />crossover is necessary, when the project includes highway improvements <br />that are in the Transportation Improvement Program, when involvement <br />with an active roadway construction project is necessary or at the <br />discretion of the NCDOT District Engineer. <br />5. The need for a TIA may be waived when Cabarrus County and NCDOT <br />agree a TIA is not needed. In the event a waiver is requested, the <br />applicant must provide evidence to show that a waiver is appropriate. <br />Waiver requests shall be handled on a case -by -case basis. <br />B. Calculating Trip Generation The trip generation of a proposed development <br />is the sum of the number of inbound and outbound vehicle trips that are <br />expected for the proposed subdivision. For purposes of determining the <br />requirement to submit a TIA, no adjustments such as modal split, pass -by <br />trips or internal capture rates will be allowed to the site traffic calculation. A <br />TIA will vary in range and complexity depending on the type and size of the <br />proposed development. When mutually agreed upon by the NCDOT, the <br />applicant, and Cabarrus County staff, the basic requirements for the TIA may <br />be modified. <br />C. Traffic Impact Study <br />1. When required by this section or NCDOT, a TIA shall be used to review the <br />potential impacts of proposed or revised developments on the State Highway <br />System. The TIA covers safety, capacity, and access issues. When required <br />and completed, a TIA shall be used by Cabarrus County and NCDOT to <br />determine the required improvements to the State Highway System within <br />the vicinity of the development to mitigate undesirable impacts of the project. <br />2. The NCDOT q <br />,,Pis trict Engineer, working together with Cabarrus County, will <br />determine the basic parameters of the TIA. When mutually agreed upon by <br />t#e NCDOT, the applicant, and the G abaFFUS County in a pre - submittal <br />conference, the basic requirements and parameters for the TIA may be <br />modified. <br />3. The TIA shall be prepared under the direct charge of, and sealed by a licensed <br />North Carolina Professional Engineer with expertise in traffic engineering. All <br />work shall be in accordance with NCDOT approved methods and input <br />parameters and shall be of sufficient scope and detail to allow <br />County and NCDOT to evaluate the impact of the development with <br />regards to roadway capacity and operational and safety improvements that <br />may be needed. <br />4. The format and contents of the required TIA shall be established in <br />conjunction with NCDOT and G abaFFUS County (see Appendix A). <br />Page 7 of 16 <br />G -1 <br />Amended Attac�Vjj number 5 <br />Page 390 <br />
The URL can be used to link to this page
Your browser does not support the video tag.