Laserfiche WebLink
9.0 PATIENT COMPARTMENT CABINETRY AND FIXTURE <br />9.1 Sub -Floor <br />Sub -floor shall be replaced with new 3 /4" marine grade plywood. Sub Floor shall be warranted <br />for the lifetime of the vehicle. NO EXCEPTION. Yes No <br />Does your bid comply? <br />9.2 h!22—rin <br />Sub -Floor shall be sanded to remove all imperfections before installation of new floor. Color <br />matched vinyl flooring shall be installed and covered up sidewall 4" for ease of cleaning. Floor <br />shall be color coordinated to the interior color scheme. Floor covering shall be L nseal (Lonplate) <br />424TX Gunmetal. <br />Does your bid comply? Yes No <br />9.3 Thresholds <br />Replace side and rear thresholds with satin finish stainless steel thresholds, which, are sealed for <br />sanitation. Add grip tape to the finished product. <br />Does your bid comply? YeS No <br />9.4 Upholstery <br />All upholstery in module shall be rep laced aced with new on shall be ligAtGREY, seat, seat <br />belts and swivel pedestal shall be rep Does your bid comply? Yes No <br />9.5 Cabinetry <br />Cabinets will be checked for sharp edges, defective areas, and professionally repaired, including <br />the following items: <br />A. Manually check caboinSemounting b make�attle proof and replace all tracks check and <br />B. Check all shelves f y <br />replace all restocking features. <br />C. Check all seatbelts and replace all defective ones. <br />D. Replace all trim with new. <br />E. Replace all screws with new. <br />nd sanitation to all cabinetry, compartments, headliner, etc. <br />F. Provide high quality clean up a <br />G. Replace all Plexi glass and check for proper operation. wer Pro Cot, bolted <br />H. Install a new side and center cot mount s and bock Str <br />d on all bolts. Add a <br />through floor and frame with nuts, washers <br />new 4" x 4" steel plate under sub floor for security. <br />1. Provide and install a new Stryker rear cot Catch. Cot catch shall be bolted through floor. <br />No Exceptions. <br />J. Install swirled aluminum kick plates on the squad bench face and the lower section of the <br />K. <br />L. <br />M. <br />N. <br />O. <br />P. <br />left wall. <br />Install swirled aluminum in the action and telemetry areas. <br />Remove existing bio waste storage. <br />Add a New safety net at the head of the squad bench. <br />Replace Squad Bench "shocks" with new, match existing. <br />Add all new IV hangers. Must meet Federal Specifications. <br />Install lockable temperature controlled drawer in ALS <br />determined at pre build meeting. <br />Cabinet for arcotics to be <br />Does your bid comply? <br />Yes No <br />49 <br />Attachment number 1 <br />F -5 <br />Page 146 <br />