Laserfiche WebLink
9.6 Bulkhead <br />Bulkhead separating front/rear compartment shall be inspected for damage r wood rot and <br />replace if necessary. <br />Does your bid comply? Yes No <br />10.0 HEATING AND AIR CONDITIONING <br />10.1 Heat/Cool Unit <br />Install new unit with wall- mounted thermostat, or equal. System shall be complete with all -new <br />hoses and fittings and shall accommodate the use of R -134A not R12 Freon. Also provide and <br />install a new auxiliary underbody condenser. Replace all vent cover with new ones to match <br />existing. <br />Does your bid comply? Yes No <br />10.2 Heat/Cool Testing <br />System shall be extensively tested for peak performance and readings shall be provided to <br />customer. <br />Does your bid comply? Yes No <br />10.3 P ,2we <br />Shall be tested and repaired or replaced to meet original equipment performanc . <br />Does your bid comply? Yes No <br />11.0 OXYGEN ANDF VACUUM SYSTEMS <br />11.1 Oxygen Svstem <br />Perform 4 -hour nitrogen leak test. Repair any leaks noted and re -test and tag system with <br />certification. <br />Does your bid comply? Yes No <br />11.2 Suction Svstem <br />Test vacuum lines, outlets for proper operation and repair or replace as necessary. Replace <br />old suction unit with NEW RS -4X 1200cc caniste <br />Does your bid comply? Yes No <br />11.3 Radio Conduit <br />A conduit shall be provided between the cab and the module for ease of Installing Rockingham <br />EMS radio coaxes. In addition, 12 volt lead and ground wires shall be installed t accommodate <br />said Radios. <br />Does your bid comply? _ Yes No <br />50 <br />Attachment number 1 <br />F -5 Page 147 <br />