My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 03 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 03 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:42:50 PM
Creation date
11/27/2017 11:08:12 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/19/2012
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turner <br />Exhibit C <br />CABARRUS COUNTY SHERIFF'S DEPARTMENT <br />AMENDMENT # 5 TO THE GMP — 6 T1 & 7 FLOOR ALTERATIONS <br />EXECUTIVE SUMMARY <br />The cost for Amendment # 5 to the GMP — Sheriff's Department 6 th & 7th Floor Alterations at <br />the Cabarrus Detention Center & Sheriff's Department project in Concord, NC, is <br />$ 1,484,360.00 and is defined by the following: <br />1) Griffin Architecture, P.A. construction drawings for the Cabarrus County Sheriff's Dept. — <br />6 and 7 th Floor Alterations dated Jan 17, 2012. (See Documents List Log in Exhibit H, <br />attached) <br />2) Griffin Architecture, P.A. project manual for the Cabarrus County Sheriff's Dept. — 6 th and <br />7ch Floor Alterations dated Jan 17, 2012. (See Documents List Log in Exhibit H, attached) <br />3) Griffin Architecture, P.A. Addenda numbers 1 and 2 (dated Jan. 31, 2012 and Feb. 20, <br />2012). <br />4) Turner Construction's Clarifications and Assumptions attached within this Amendment. <br />The summary below details the cost of Amendment # 5: <br />Trade Package Cost <br />$ <br />1,159,815 <br />Subguard Program <br />$ <br />7,846 <br />Turner /Liability Ins. <br />$ <br />14,487 <br />Direct Work Sub -Total <br />$ <br />1,182,148 <br />Payment & Performance Bond <br />$ <br />11,145 <br />Builder's Risk Insurance <br />$ <br />1,076 <br />Cost of the Work Total <br />$ <br />1,194,369 <br />Turner General Conditions <br />$ <br />135,336 <br />Turner CM Fee <br />$ <br />57,369 <br />Total <br />$ <br />1,387,074 <br />Contractor's Contingency of 4% <br />on the Cost of the Direct Work <br />$ <br />47,286 <br />Project Total $ 1,434,360 <br />Allowance — Owner's Contingency $ 50,000 <br />Amendment # 5 to the GMP $ 1 9 484 9 360 <br />Exhibit — Executive Summary <br />1 of 2 <br />Page 5 of 24 Attachment number <br />F -3 MarFpAth, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.