Laserfiche WebLink
Exhibit B <br />AMENDMENT # 5 TO THE CONTRACT FOR CONSTRUCTION MANAGER AT <br />RISK FOR THE CONSTRUCTION OF THE CABARRUS COUNTY DETENTION <br />CENTER BETWEEN CABARRUS COUNTY, OWNER, AND TURNER <br />CONSTRUCTION COMPANY, CONSTRUCTION MANAGER AT RISK. <br />Pursuant to Article 7 of the Contract, the owner and the Construction manager <br />established a Guaranteed Maximum Price and the contract time for the work as set below; <br />ARTICLE 1- GUARANTEED MAXIMUM PRICE <br />The Construction manager's Guaranteed Maximum Price for the construction of <br />the Detention Center and associated Site work, including the estimated Cost of Work as <br />defined in the Contract and the Construction Manager's Fee as there in defined is: <br />$1,484,360 <br />This price is for the performance of the Construction of the 6 & 7 t ' floor up fit and <br />alterations in accordance with the Contract Documents and the following exhibits: <br />Exhibit I Guaranteed Maximum Price Breakdown, Amendment 5 Book dated <br />March 5`', 2012 including Exhibits A through M) <br />Exhibit II Assumptions and Clarifications (Exhibit F of the Turner 6 & 7`' Fl. <br />Alteration Amendment 5 Book dated March 5` 2012) <br />Exhibit III Matrix for The General conditions and Construction <br />Management Fee ( Exhibit 1 of the Turner CM at Risk Contract) <br />Exhibit IV Contract document list ( Exhibit H of the Turner 6 & 7' Fl. <br />Alteration Amendment 5 Book dated March 5` 2012) <br />Exhibit V Basis of the Estimate (Exhibit D of the Turner 6` & 7` Fl. <br />Alteration Amendment 5 Book dated March 5 2012) <br />ARTICLE 2- CONTRACT TIME <br />The Date of Substantial completion established by this amendment is <br />July 17, 2012. <br />Owner: Cabarrus County, North Carolina <br />Mike Downs, County Manager <br />CM at Risk: Turner Construction Company 3 1 )-- 1 1) ^ <br />Gary Stradowski, Vice PresidW and General Manag r <br />Page 4 of 24 <br />Attachment number 1 <br />F -3 March 5th, 2012 Page 44 <br />