Laserfiche WebLink
Duke <br />v GI ergyo <br />kW <br />450 <br />-04M612012 <br />400 <br />464.4 <br />50000.0 <br />350 <br />300 <br />- <br />250 <br />- <br />200 <br />. koft <br />150 <br />400.0 <br />100 <br />M South (kWy <br />50 <br />0 -1 1 031]1 43+013 0305 4307 4309 43!11 43113 43!15 43117 43!19 43{21 43.3 43!25 43!27 0.9 43131 <br />Time (Days) <br />Figure 9: March 2012 load profile <br />Usage <br />by Week for 0212812012 <br />-04M612012 <br />k <br />464.4 <br />50000.0 <br />400.0 <br />45444.4 <br />354.4 <br />44000.0 <br />35000.0 <br />300.0 <br />30000.0 <br />254.4 <br />25000.0 <br />200.0 <br />20000.0 <br />150.0 <br />15000.0 <br />104.4 <br />10000.0 <br />50.0 <br />5444.0 <br />4.0 0.0 <br />02,28 03178' 03!13 03{20 03{27 0403 04110 <br />Figure 10: Average monthly demand and consumption for metered period <br />Rev A 2012 -05 -15 <br />Page 15 <br />Final Draft <br />G -2 Page 339 <br />