My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 03 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 03 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:14:17 PM
Creation date
11/27/2017 11:14:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1 <br />1 <br />Attachment number 1 <br />F -5 Page 96 <br />PROJECT NO.09.106 IP BASED VIDEO VISITATION SYSTEM <br />KENT COUNTY CORRECTIONAL REPLACEMENT 284690-5 <br />KENT COUNTY 04/3012010 <br />' <br />1.3 <br />SUBMITTALS <br />A. <br />Product Data: <br />' <br />1. For each type of product indicated, Including dimensions and data on features, performance, <br />electrical characteristics, ratings, and finishes. <br />B. <br />Shop Drawings: <br />1. Block diagrams of the proposed system. <br />' <br />2. Physical and logical network diagrams of the proposed network configuration. <br />G. <br />Samples for Initial Selection: <br />1. Manufacturer's color charts showing the full range of colors available for units with factory- applied <br />finishes. <br />D. <br />Samples for Verification: <br />1. Of each type of exposed finish required, prepared on samples of size indicated below and of same <br />thickness and material indicated for Work. Where finishes involve normal color and texture <br />variations, include Sample sets showing the full range of variations expected. <br />E. <br />Quality Assurance/Control Submittals: <br />1. Design Data <br />2. Test Reports <br />3. Certificates <br />4. Manufacturer's Instructions <br />5. Manufacturer's Field Reports <br />F. <br />Closeout Submittals: <br />1. 0 & M Manuals: three copies plus one electronic copy (DVD) <br />G. <br />Wiring Diagrams <br />diagrams for and subsystems. Show all <br />1. Provide complete point -to -point wiring all systems <br />components in the communications path from the head end room through all Intervening system <br />components, including terminal boards to the individual end devices. The Intent of this requirement <br />Is to provide a document that shall permit end -to -end tracing of the system wire and cabling. Where <br />conductors are grouped Into a cable for long site runs, a single line properly identified shall be <br />shown. Where these cables fan out for termination, individual wire termination and markings shall <br />be shown. <br />H. <br />Equipment Locations <br />1. Provide drawings that show the elevations for every equipment rack that Indicate exact locations of <br />all equipment in the system. <br />I. <br />Shop Detail Drawings <br />02010 Tower PlnkslerTitus Associates -All Rights Reserved <br />Attachment number 1 <br />F -5 Page 96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.