Laserfiche WebLink
Interagency Agreement for Collaborative Technology Services 3 <br />Schedule CCS: Project #1 <br />• CCS staff will move the following equipment to the County's data center: <br />• 3 Cyber Power PR6000LCDRTXL5U(if necessary) <br />• 1 Bradford NS9200 <br />• 1 Bradford NS2200 <br />• 1 Dell M 1000e Blade Server <br />• 2 Dell PowerEdge 2950 servers <br />• 1 Barracuda Spam and Virus firewall 600 <br />• 1 Barracuda Spam and Virus firewall 400 <br />• 1 Barracuda Message Archiver 850 <br />• 4 EMC KTN -STL4 disc Arrays <br />• 1 EMC power distribution block <br />• 1 EMC CX4 Storage Processor <br />• 1 Apple Xserve <br />• 1 Dell ML6000 tape autoloader <br />• 1 HP Procurve 5406ZL <br />• 1 Packeteer PacketShaper 10000 <br />• 1 Cisco VPN 3000 Concentrator <br />• 1 8e6 Internet Filter <br />• 1 8e6 Enterprise Reporter <br />• 1 M86 Security 500 <br />• 1 M86 Security 700 <br />• 1 Sonic Wall e7500 <br />CCS will make all attempts to provide a replicable test environment prior to the <br />movement of the CCS SAN. <br />Performance Expectations: <br />The Cabarrus County School IT Staff will have on -going 24:7 access to the CCS Server <br />Environment Datacenter for as long as the CCS servers are located at the agreed upon County <br />data center location(s). Employee access will be approved by Cabarrus County IT Director and <br />Cabarrus County Schools Assistant Superintendent. <br />• Install and test Fiber connections <br />• Install rack <br />• Install power outlets <br />• Physically move CCS servers <br />Once physical migration begins, no more than 72 hours should occur before CCS <br />network is operational at the Cabarrus County data center. <br />31 <br />Attachment number 2 <br />F -9 Page 151 <br />