Laserfiche WebLink
Estimated Cost Per Jurisdiction <br />Mecklenburg County: <br />West Branch Nature Preserve: <br />Site Control: 1,589 LF /.3 miles <br />Acquisition Needed: 0 LF /0 Miles <br />Mallard Creek: <br />Site Control: 10,710 LF /2.03 miles <br />Acquisition Needed: 9,864 LF/1.87 miles <br />Total Distance: 22,163 LF /4.2 miles <br />Estimated Cost: $4,197,450.57 <br />20% Match: $839,490.11 <br />City of Kannapolis: <br />WBNP to Hwy 73 <br />Site Control: 8,120 LF/1.54 miles <br />Acquisition Needed: 1,094 LF /.21 miles <br />Total Distance: 9,214 LF/1.75 miles <br />Estimated Cost: $1,745,039.46 <br />20% Match: $349,007.89 <br />City of Concord: <br />HWY 73 to Derita Road <br />Site Control: 5,718 LF /1.08 miles <br />Acquisition Needed: 20,622 LF/3.91 miles <br />Derita Road to Harrisburg <br />Site Control: 44,665 LF/8.23 miles <br />Acquisition Needed: 0 LF /0 miles <br />Total Distance: 71,005 LF / 13.44 Miles <br />Estimated Cost: $12,364,704.93 ** (Does not include 5,718 LF from Moss Creek) <br />20% Match: $2,472,940.99 <br />Town of Harrisburg: <br />Harrisburg to County Line <br />Site Control: 1,217 LF /.23 miles <br />Acquisition Needed: 16,703 LF/3.16 miles <br />Total Distance: 17920 LF/3.39 miles <br />Estimated Cost: $3,393,868.80 <br />20% Match: $678.773.76 <br />Construction Corridor Roll Up <br />Site Control: (59 %) 66,301 LF/12.56 miles <br />Acquisition Needed: (41 %) 48,283/9.15 miles <br />Total Construction Corridor: 114,584 LF/21.7 miles <br />Estimated Cost: $21,701,063.76 <br />Estimated Match: $4,340,212.75 <br />Total Grant Request: $17,360,851.01 <br />( ** Does not include 5,718 LF of Concord's Moss Creek) <br />Total Corridor Roll Up (including completed sections) <br />Site Control: 40 %/87,103 LF /16.53 miles <br />Acquisition Needed: 23 %/48283 LF/ 9.38 miles <br />Completed Sections: 37 %/81.775 LF/15.49 miles <br />TOTAL: 218,378 LF/ 41.4 miles <br />Attachment number 2 <br />G -5 <br />Page 139 <br />