My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2010 03 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2010
>
AG 2010 03 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2010 9:19:32 AM
Creation date
11/27/2017 11:22:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
3/10/2010
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Land Use Plan for the Harrisburg Planning Area <br />LandDesign PN- 1008319 <br />October 2009 Invoice Period <br />Progress Summary <br />The following is a summary of the work completed by the LandDesign team for <br />the period indicated above. <br />Phase I: Inventory and Analysis <br />B. Education Session <br />• Preparation for the education session (powerpoint presentation and <br />additional research) with elected and appointed officials and the school <br />board. <br />C. Data Collection <br />• Gathered additional information relevant to the issues that were identified <br />in stakeholder interviews. <br />D. Review of Data, Regulations, Plans and Studies <br />• Reviewed additional data gathered, particularly specific plans for <br />development sites, utilities and transportation network components. <br />E. Inventory and Assessment of Existing Conditions <br />• Continued research of existing conditions intended to provide a snapshot <br />of the study area. <br />• Continued analysis of demographic, housing and economic conditions. <br />• Assessed infrastructure conditions and potential for expansion of utilities. <br />• Prepared templates for project documents and continued documentation <br />of the detailed assessment. Later in phase IV, this documentation will be <br />incorporated into the draft plan. <br />F. Advisory Committee Meeting <br />• Held Advisory Committee meeting. The purpose of this meeting was to <br />introduce the team, schedule and project to the committee. Also, initial <br />feedback and findings were shared with the committee along with a <br />discussion of issues <br />G. Stakeholder Interviews <br />Attachment number 1 <br />~-1 Page 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.