My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2010 06 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2010
>
AG 2010 06 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2010 8:39:10 AM
Creation date
11/27/2017 11:22:40 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/15/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL PERMITS <br />UNIT/FIXTURE DESCRIPTION FEES <br />A/C Units - 1 hp to 5 hp <br />Greater than 5 hp constitutes and additional unit $36.05 <br />Heating Units - 0 to 150,000 BTU <br />Greater than 150,000 BTU constitutes an additional unit $36.05 <br />Gas Piping $25.75 <br />Boilers (150,000) $25.75 <br />Thru-wall heating and cooling units $25.75 <br />Wall furnace, Floor furnace, and Unit Heaters $25.75 <br />Commercial Exhaust Hoods $51.50 <br />Commercial Dryers $51.50 <br />Replace Heating 0 (150,000-5t) (no duct work) $25.75 <br />Cooling $25.75 <br />Fan Coil (Heating and/or Cooling) $25.75 <br />Conversion Burner (150,000) $25.75 <br />Refrigeration $51.50 <br />Duct Work $25.75 <br />Replace heat $25.75 <br />Replace air $25.75 <br />There will be a $50.00 callback or re-inspection fee charged for any return trip to a job site if the <br />contractor, subcontractor, or owner is at fault. <br />D <br />l <br />t <br />: <br />e <br />e <br />e <br />/+nn~\ -~ nlir~hlc +hc A/Ic~h~nin~l Demmi+ fcc ~nc~rlnlc ~ h~ll ~ nhi <br /> <br /> <br /> <br />Add: All commercial mechanical permits will be based on estimated cost. New construction <br />shall be calculated using the Construction Schedule A. <br />Commercial up-fits shall be calculated using the Construction Schedule B. The minimum fee for <br />any mechanical permit shall be $25.75. <br />Attachment number 1 <br />F-3 Page 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.