My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2010 06 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2010
>
AG 2010 06 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2010 8:39:10 AM
Creation date
11/27/2017 11:22:40 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/15/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRICAL AND MOBILE HOME PERMITS <br />SIZE OR TYPE OF SERVICE FEES <br />60 Ampere Service $41.20 <br />100 Ampere Service $41.20 <br />125 Ampere Service $41.20 <br />150 Ampere Service $46.35 <br />200 Ampere Service $56.65 <br />225 Ampere Service $66.95 <br />250 Ampere Service $77.25 <br />275 Ampere Service $82.40 <br />300 Ampere Service $87.55 <br />325 Ampere Service $92.70 <br />350 Ampere Service $92.70 <br />400 Ampere Service $123.60 <br />Saw Service $41.20 <br />Pools, Grounding and Wiring $41.20 <br />Well Services and Signs $41.20 <br />Change of Service $41.20 <br />Up to 200 amps service. Above 200 amps is based on size of service <br />HVAC Wiring $41.20 <br />LCD's Per Residence $41.20 <br />Miscellaneous Electrical Repair/ADD $41.20 <br />Temporary Power $128.75 <br />Means of calculating a greater rating shall be $123.60 for the first 400 amperes plus .25 per each <br />additional ampere. <br />There will be a $50.00 callback or re-inspection fee charged for any return trip to a job site if the <br />contractor, subcontractor, or owner is at fault. <br />Add: <br />All commercial electrical permits for new construction or new projects shall be calculated using <br />the Construction Schedule A when amperage is not applicable. When amperage is applicable, <br />the Electrical and Mobile Home Permit fee schedule shall apply. <br />All commercial electrical permits for existing buildings, or for projects where any previous <br />construction has occurred, or for the alteration, demolition, remodel, removal, repair, re-roofing, <br />up-fit, or reconstruction of any commercial structure or project, shall be calculated using the <br />Construction Schedule B. <br />All commercial electrical permits will be based on estimated cost. <br />New construction shall be calculated using the Construction Schedule A. <br />Commercial up-fits shall be calculated using the Construction Schedule B. <br />The minimum fee for any mechanical permit shall be $41.20 <br />Attachment number 1 <br />F-3 Page 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.