My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2009 06 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2009
>
AG 2009 06 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2010 4:01:01 PM
Creation date
11/27/2017 11:25:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/5/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Y A T G S e C I~1 It I: 1 '1' 7 I3 l: R C ~ II U G II 1? S <br />May 12, 2009 <br />(Revised May 27,2009) <br />Mr. Mike Downs <br />Deputy Manager <br />Cabarrus County <br />Post Office Box 707 <br />Concord, NC 28026-0707 <br />Reference: Phase 1 Services <br />Cabarrus County Satellite Office Building <br />Comm. No. 28060.00 <br />Subject: <br />Dear Mike: <br />Proposal for Architectural-Eng <br />(Referred to as "Exhibit A") <br />As per our meeting last week, we h <br />have included a Proposal for our <br />Services is based on the Pha <br />considerations that may be requir <br />desired inclusions. This do nt <br />Agreement for Services v' <br /> <br />are oject Development Cost for your consideration and <br />I-En Bering Services for the project. Our Agreement for <br />n of t included herein with additional expectations of <br />ity of Concord, the Development Process, or Owner- <br />referred to as "Exhibit A" and will be considered a part of the <br />6102 & 6201. <br />Our Agreement for Se s (Contr ) is based on a Site Master Plan (dated 03/24/09) -Exhibit "B"; a <br />Diagrammatic Floor Plan- me 3 ted 02/16/09) showing Phase 1 Building to be approximately 25,000 <br />SF -Exhibit "C"; a Prelimina ion Sketch showing the proposed materials and image of the exterior <br />of the facility -Exhibit "D"; and D Registered Project Checklist (dated May 2008) -Exhibit "E." <br />The project is based on the Owner's desire to LEED Certify the project under USGBC Standards with the <br />goal of attaining a Silver Certification for the project. (Refer to attached LEED Registered Project Checklist). <br />PROJECT DEVELOPMENT COST <br />Phase 1 -Opinion of Construction Cost <br />- Building Cost: 25,000 sf @ $170 / sf <br />- Base Site Work Cost <br />- Storm water detention / BMP for entire site <br />(including allowance for rock removal) <br />$4,250,000 <br />680,000 <br />225,000 <br />' Rocl< removal / offsite fill import 150,000 <br />145 Union Street South s+ Concord, NC 28025 f+ Tel 704.788.2000 ~ Fax 704.788.2010 ~ ~"NA~a~hrnen~number1 <br />Page 1 of 3 E:\admm\YATES\200a128060 00\techl0pinion of Cost OS-12-09.wpd <br />' F-1 Page 67 of 433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.