My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2009 06 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2009
>
AG 2009 06 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2010 4:01:01 PM
Creation date
11/27/2017 11:25:33 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/5/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Improvements to public roads including curb and gutter, sidewalks, <br />turn lanes and median as may be required by the City of Concord <br />- Access Road to CCS Bus Maintenance Facility <br />(minimum width with no curb and gutter) <br />- Additional driveway from Union Cemetery Road, interior road and <br />grading of future building pad. (Including allowance for rock removal) <br />- Grading of site area near CCS Bus Maintenance Facility <br />- Screen walls for parking areas as may be required by the City of Concord <br />Total Opinion of Construction Cost for Phase 1: <br />- A-E Fee - 8.75% of Construction Gosts estimated to be $6,250,000 <br />- (less $12,500 credit for Reusable Portion for Work <br />developed under Masterplanning Services) = Net Fee: $5 75 <br />- Reimbursable Expense (Allowance) <br />- LEED Documentation & Certification: <br />- Civil /Architectural Project Management racti w/USG ,Calculations <br />& Modeling, Docume 'o ubmittal Requirements <br />- Mech / Plbg / Dual System Design En odeling required for <br />Fire Protection LEED Certific <br />- Electrical /Lighting LEED Certifica n en n <br /> <br />Technology <br />Commissioning <br />(Allowance) <br />~sioning of HVAC /Plumbing / <br />Technology Systems required to <br />& Atmosphere Prerequisite 1 <br />on, Printing, Registering <br />- Reimbursable <br />Project for LE <br />- Demolition of <br />- <br />Structures, Paving & Installation of Erosion Control <br />Geotechnical Subsurfacesinvestigation (Allowance) <br />Geotechnical Earth Material Testing during Construction (Allowance) <br />Topographical /Boundary Survey (Allowance) <br />Technology -Telephone (Voice Over IP, Computers & Other Technology <br />(Allowance) - by Owner (Services of YCH not included) <br />350,000 ' <br />40,000 <br />250, 000 <br />250,000 <br />55,000 ' <br />$6,250,000 ' <br />$ 546,875 <br />35,000 <br />75,000 <br />18,000 <br />2,500 <br /> <br />90,000 <br />10,000 <br />35,000 <br />10,000 <br />(To be determined) ' <br />- Furniture (Allowance) - by Owner (Services of YCH not included) (To be determined) <br />- Unassigned Contingency 500,000 <br />ANTICIPATED TOTAL PROJECT DEVELOPMENT COST: $7,572,375 <br />The above project description and allowances for anticipated costs on the project do not include the <br />requirements for Traffic Signaling Lights, adjustments to Existing Utilities and Other Requirements that may <br />be mandated by the City of Concord or the NCDOT for the project development. <br />Page 2 of 3 E:ladmin\YATES\2008128060.001tech10piaAc~2bGlEmi~i8~61bQ11 1 <br />F_~ Page 68 of 433 <br />i~ <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.