Laserfiche WebLink
<br /> <br />' ^ Observe the passive LFG collection and. venting system installation and intermediate <br />cover placement. <br />' ^ Observe the liner subgrade prior to geomembrane installation to verify that the surface is <br />acceptable and will not damage the geomembrane. <br />' ^ Oversee placement and compaction of protective and vegetative cover soils. <br /> ^ Oversee installation of the final cover berms/swales, downdrains and perimeter <br />' drainage swales. <br /> Task 3.0 -Construction Quality Assurance Monitoring Services <br /> Task 3.1 -Liner and Composite Monitoring <br />' In addition to part-time RPR services, CDM will provide CQA services for the 40 mil LLDPE <br /> and geocomposite drainage net. Specifically, the following tasks will fulfill the CQA <br /> requirements associated with the C&D landfill closure. Documentation will be collected, <br />' assembled, and presented for Solid Waste Section review certifying that the closure construction <br /> has been completed in accordance with the applicable Permit Conditions and Contract <br /> Documents. <br /> CQA Services for Geomembrane Liner and Geocomposite Drainage Lam <br /> CDM will provide construction monitoring services (excluding testing) including the following: <br />' ^ Review the panel layout proposed by the liner subcontractor <br /> ^ Oversee installation of the geomembrane later including seaming and nondestructive in- <br />' field seam testing as required by the project specifications. <br /> ^ Oversee destructive sampling for the testing of "Seam Strength" and "Peel Adhesion' <br /> <br />' . <br />O <br />ll <br /> ^ <br />versee insta <br />ation of the geocomposite drainage net. <br />' ^ Oversee liner repairs. <br />^ Document the location and repair of any liner defects. <br />' For purposes of this amendment CDM has estimated a total of 270 hours (60 hours/week for 4.5 <br />weeks) at a rate of $85.00 per hour. The daily work schedule is assumed to be the same as <br />defined in Task 2.0 above. A separate day-by-day log will be kept of the CQA Inspector hours <br />so that the County can track the expenditure of these hours. CDM will be entitled to additional <br />hours if the actual number of hours warranted during construction exceeds 270. However, only <br />those hours worked and authorized in advance by the County will be submitted for payment. <br />' Hours will be presented to the County on a weekly basis for review. <br />CDM will conduct a separate pre liner installation/coordination meeting with the Contractor <br />and their liner subcontractor prior to installation. Meeting minutes will be prepared and <br />distributed to all attendees. <br /> <br />Attachment number 1 <br />' F-10 Page 263 of 433 <br />