Laserfiche WebLink
SUBMITTAL REQUIREMENTS <br />The RFQ submittal shall contain the following items arranged in order. <br />GENERAL <br />Maximum one (1) page introductory letter (See Scope of Services) <br />RELEVANT COMPANY EXPERIENCE <br />This section must include: <br />- A listing of recent relevant project experience related to providing <br />needs/feasibility studies, master-plan and design of public safety training <br />facilities or equivalent. <br />- A description of the company's responsiveness to clients, its ability to <br />complete its jobs on schedule and within budget, and its quality <br />assurance/quality control (QA/QC) practices. <br />- A description of the current personnel and equipment used to work on those <br />projects along with their current resumes. <br />- Project descriptions should include a summary of scope, location, ability to <br />mobilize and complete work in specified times, key personnel and client <br />contact. <br />CRITERIA FOR SELECTION <br />All submittals received will be reviewed by staff based on the following criteria. <br />- The ability, capacity, skill, reputation, experience and responsiveness of the <br />firm or individual(s) to perform the contract and provide the services <br />required with experience in similar types of projects. <br />- Documentation of proven related and successful experience. <br />- Reference check <br />- Familiarity with local area <br />- Ability to respond quickly and thoroughly to requests and contract <br />requirements. <br />Firms or individuals may be selected for oral interviews. <br />Page ~ 2 <br />F-8 <br />Attachment number 2 <br />Page 178 of 627 <br />