My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2009 07 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2009
>
AG 2009 07 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 9:53:28 AM
Creation date
11/27/2017 11:25:56 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/8/2010
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This proposed Phase 2 fee assumes that Civil Engineering and Environmental <br />Investigations will not be required in Phase 2, or will be performed by the County <br />through a separate contract. <br />Phase 3: Schematic Design <br />Based on the approved program/cost estimates of Phase 1 and the selected site of Phase 2, <br />SCNA will provide multiple rounds of design sketches presented to the Planning Committee <br />to develop the proposed site plans and building plans. The final round would include <br />updated estimated costs of construction. SCNA will provide colored renderings including <br />site plan showing phased construction and proposed building plans. SCNA will provide a <br />presentation of the Schematic Design renderings/documentation to the Planning Committee <br />and assistance with presentations to other area governmental bodies, as required. <br />Our proposed fee to perform the requested services of Phase 3 is 20% of an <br />anticipated 8% design fee plus reimbursables. The 8% figure is calculated from the <br />total, approved, estimated construction cost identified in Phase 1 and updated in <br />Phase 2. Appropriate portions of the Phase 1 and 2 fees will be credited to this Phase <br />3 fee. <br />This proposed Phase 3 fee does not include any allowance for LEED design. As soon <br />as the extent and goals for LEED are established in Phases 1 and 2, SCNA will be able <br />to propose the appropriate fee addition for pursuing LEED certification. <br />Phase 4: Design Development through Construction Administration <br />During Phase 4, SCNA will provide afl necessary design services to carry the selected <br />portions of the design/construction through completion. <br />Our proposed fee to perform Phase 4 design services will be based on the County <br />selected portions of the facilities fo be constructed and will be negotiated at that time. <br />If you have any questions please feel free to contact us at your convenience. If you are in <br />agreement, we will prepare an AIA contract for your review and execution. <br />We look forward to the opportunity of working with Cabarrus County on this important and <br />exciting project. <br />Sincerely, <br />~n ~QitA/Q~ ~, t <br />Kenneth C. Newell, AiA, LEED-AP <br />President <br />ARCHITECTURE , <br />P!_ANNING <br />INTERIORS <br />Attachment number 11 <br />CONSULTING <br />F_8 Page 213 of 627 <br />
The URL can be used to link to this page
Your browser does not support the video tag.