Laserfiche WebLink
<br />in the area to the south of the existing C&D. The samples will be submitted for <br />laboratory analysis of the Appendix I constituents (metals and volatile organic <br />compounds). <br />Four Shelby tube samples and two bulk samples will be submitted for laboratory <br />analysis of grain size, USCS Classification, saturated hydraulic conductivity, and <br />porosity. <br />^ In-situ hydraulic conductivity {permeability) testing will be performed on five <br />piezometers and/or monitoring wells using slug-testing methods. Slug tests will be <br />per#ormed on four newly installed piezometers and relocated wells CD-4 and CD-5. <br />Additional items may be required, depending on future discussions with the SWS in Task 3.1. It <br />is recognized that the cost for drilling services will depend upon the final boring plan <br />approved/ required by the SWS and the actual amount of work that is completed in the field. <br />The cost estimate for this task is based on the assumption that a total of six HSA borings and six <br />new piezometers will be necessary for the site hydrogeologic report, the new facility plan, and <br />the design hydrogeologic report for the next C&D phase. If additional borings and piezometers <br />are required, CDM will be entitled to additional compensation. <br />The budget far this task is based on the boring plan discussed in Task 3.1. For this Amendment, <br />we have made the following assumptions: <br />^ Access, including bulldozed roads (if required} to boring locations, will be provided by <br />the drilling subcontractor. <br />^ The field work can be completed in six, 10-hour days. <br />^ A CDNi eolo ist/en ineer will be onsite for all the drilling. <br />g g g <br />^ Proper abandonment of all planned and existing piezometers and monitoring wells is <br />not included in this Amendment. The piezometers and monitoring wells will have to be <br />abandoned prior to construction of the expansion and one~permanent monitoring well <br />will have to be relocated. <br />^ The installation or relocation of any gas or ground water monitoring wells (with the <br />exception of CD-4 and CD-5) is not included. <br />Piezometers will be installed using two-inch PVC casing with a mutimum of five feet of machine <br />slotted 0.010-inch screen set in a sand pack in/below the groundwater table. A bentonite seal <br />will be placed above the slotted section in each of the wells. Two nested pair of piezometers will <br />be installed to obtain vertical gxadient information. Groundwater measurements will be <br />collected by CDM personnel 24 hours and one week after well completion. <br />Task 3.3 - Hydrogeologic Laboratory Testing <br />Bulk and undisturbed samples will be collected for laboratory testing as required by Rule <br />.0538(a)(4}{E} and {b){1). The samples will be analyzed for vertical hydraulic conductivity and <br />porosity for remolded and undisturbed samples, in addition to grain size, and USCS <br />4 Item# 9 <br />Attachment number 1 <br />Page 88 of 185' <br />F-5 <br />