My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 02 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 02 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:01 PM
Creation date
11/27/2017 11:30:07 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/19/2007
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of North Carolina for the purposes of water quality protection, wildlife and fish habitat, and <br />floodwater storage. The primary responsibilities of the EEP and its contractors and consultants <br />during and after this Project will be: <br />1. To apply and receive approval for all environmental permits prior to the construction phase of <br />this Froject. <br />2. To provide monetary funds for Project design and construction, equuent, and labor from the <br />inception of the Project to its completion as the EEP deems reasona~~e or appropriate: No funds <br />from Cabarrus County aze required. ,,: ;;H, <br />3. To assume responsibility for the selection, oversight, <br />and consultants to conduct this work. <br />4. To ensure that activities are carried out in as <br />well as with all applicable laws and regulations <br />States of America. <br />5. To forward design plans to Cabarrus GQUnty <br />6. To review and monitor each phase of th8j'ro <br />ensure that all technical and ecological specific, <br />have been met. <br />F %,h~ ~; <br />7. To meet with Couiitstaff at a 1'Cgquency suf <br />Project. ~` ~;;, ~-" <br />8. To remove a~ <br />and will gcBde'3"1ti <br />9. To'f~7esponsil <br />Propertyat~a, as c <br />~'., <br />I0. To warraniY1 <br />(5) years followi3 <br />the Project will be <br />areas <br />with fire conditions o: <br />ate of Iz~orth Carolina <br />United <br />as <br />for review aiYd~nment prior to implementation. <br />Wand after its completion to <br />the final approved plan <br />to review and assess the progress of the <br />t~' spoil material, at the completion of the Project <br />temporary and permanent seeding. <br />e portions of the Project lying within the Protected <br />Conservation Easement. <br />stream restoration portion of the Project for a minimum of five <br />pletion. Any repair or maintenance that must be performed on <br />use for a minimum of five (5) yeazs. <br />To be resuonsi <br />environmental compliance and regulatory requirements of the Project. <br />12. To provide Project signs and public communications, subject to County review. <br />Il <br />
The URL can be used to link to this page
Your browser does not support the video tag.