Laserfiche WebLink
(27) Maximum Daily Discharge. s43aN-t~ean The total concentration or mass of a pollutant discharged <br />from all production periods during a twenry-four (24) hour calendaz day. <br />(28) Medical Waste. slieA--fnean Isolation wastes, infectious agents, human blood and blood products, <br />pathological wastes, sharps, body parts, contaminated bedding, surgical wastes, potentially <br />contaminated laboratory wastes, and dialysis wastes. <br />(29) National Prahibitive Discharge Standard or Prohibitive Discharge Standard or Prohibited <br />Discharges. s1iaA-~nean Absolute prohibitions against the discharge of certain substances; these <br />prohibitions appear in Section 2.1 of this ordinance and are developed under the authority of 307(b) <br />of the Act and 40 CFR, Section 403.5. <br />(30) New Source. eHal~r~ <br />(i) Any building, structure, faciliry, or installation from which there is (or may be) a discharge <br />of pollutants, the construction of which commenced after the publication of proposed <br />Categorical pretreatment standards under Section 307(c) of the Act which will be applicable <br />to such source if such standards aze thereafter promulgated in accordance with section <br />Section-307(c), provided that: <br />(A) the building, structure, facility, or installation is constructed at a site at which no <br />other source is located; or <br />(B) the building, structure, facility, or installation totally replaces the process or <br />production equipment that causes the discharge of pollutants at an existing source; <br />or <br />(C) the production or wastewater generating processes of the building, structure, <br />facility, or installation aze substantially independent of an existing source at the <br />same site. In determining whether these are substantially independent, factors such <br />as the extent to which the new facility is integrated with the existing plant, and the <br />extent to which the new facility is engaged in the same general type of activity as <br />the existing source, should be considered. <br />(ii) Conshvction on a site at which an existing source is located results in a modification rather <br />than a new source if the construction does not create a new building, strvcture, facility, or <br />installation meeting the criteria of section 30(i)(B) or 30 i C) above but otherwise alters, <br />replaces, or adds to existing process or production equipment. <br />(iii) For purposes of this definition, construction of a new source has commenced if the owner or <br />operator has; <br />(A) Begun, or caused to begin as paM of a continuous on-site construction program: <br />(1) Any placement, assembly, or installation of facilities or equipment; or <br />(2) Significant site preparation work including clearing, excavation, or <br />removal of existing buildings, structures, or facilities which is necessary <br />for the replacement, assembly, or installation of new sowce facilities or <br />equipment; or <br />(B) Entered into a binding contractual obligation for the purchase of facilities or <br />equipment which are intended to be used in its operation within a reasonable time. <br />~ ~~ <br />