My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 06 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 06 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2007 2:40:23 PM
Creation date
11/27/2017 11:30:53 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/26/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Permit Modification <br />(1) Modifications of permits shall be subject to the same procedural requirements as the issuance of <br />permits except as listed below. ~'ellewsAnv chanees or new conditions in the roermit shall include a <br />reasonable time schedule for compliance. <br />(A+) changes in the ownership of the dischazge when no other change in the permit is indicated; <br />(B+i) a single modification of any compliance schedule not in excess of four months; ar~ <br />(C~+i) modification of compliance schedules (construction schedules) in permits for new sowces <br />where the new source will not begin to discharge until control facilities aze operational; <br />(D) modifications ofthe monitorine proa~am comained in the nermit; <br />(E) to incorporate any new or revised Federal. State or local pretreatrnent standards or <br />reauirements; <br />(Fl to address sienificant alterations or additio~s to the user's operation, processes, or <br />wastewater volume or character since the time of wastewater discharee nermit issuance: <br />(G) a chanee in the POTW that requues either a temporarv or uermanent reduction or <br />e]imination ofthe authorized dischazee; <br />(H) information indicatine that the permitted dischar¢e noses a threat to the POTW, the POTW <br />personnel, or the receivin wg aters: <br />Q) violation of anv terms or conditions of the wastewater dischar~e permit; <br />~ misrepresentations or failure to fu]lv disclose all relevant facts in the wastewater dischazge <br />permit aaalication or in any required reporting; <br />(K) revision or a qrant of variance from cateeorical pretreatment standards pursuant to 40 CFR <br />403.13• <br />(Ll to correct tmoeraphical or other emors in the wastewater dischaz¢e uermit: or <br />(Ml to reflect a transfer of the facilitv ownership or oaeration to a new owner or operator. <br />(2) Within nine (9) months of the promulgation of a Nationa] categorical pretreatment standard, the <br />wastewater discharge permit of users subject to such standards shall be revised to require compliance <br />with such standazd within the time frame prescdbed by such standazd. Where a user, subject to a <br />National categorical pretreatment standazd, has not previously submitted an application for a <br />wastewater discharge permit or does not currentlv have an SIU permit, as required by section 4.2 (b), <br />the user shall apply ' within 180 days after the promulgation of the <br />such standazd. <br />(3) A request for a modification by the Permittee shall constitute a waiver of the 60 day notice required <br />by N.C.G.S. 143-215.1 (b) for modifications. <br />(c) Permit Transfer <br />37 <br />G -'~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.