My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 06 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 06 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2007 2:40:23 PM
Creation date
11/27/2017 11:30:53 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/26/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y A T E S ^ C H R E I T Z B E R G ~ H U G H E S <br />May 30, 2007 <br />Mr. Mike Downs <br />Deputy County Manager <br />65 Church Street, SE <br />Post Office Box 707 <br />Concord, NC 28026-0707 <br />Reference: Old Bethel Elementary School <br />Midland, North Carolina <br />Comm. No. 26005.00 <br />Subject: Proposal for Structural investigation Services <br />Dear Mr. Downs: <br />Our firm is pleased to submit a Proposal for Structurai Investigation Services for the Old Bethel Elementary School <br />located on Highway 24/27 in Midland, NC. The services shall be limited to the 2-story, 1927 Main Classroom <br />Buiiding only - previously referred to as "Building A". <br />SCOPE OF WORK (BASIC SERVICES) <br />This Proposal provides for the Professional Opinion of a North Carolina Registered Architect and Structural Engineer <br />as to the structural condition of the above-stated existing building. The purpose of this investigation is to assist the <br />Owner in determining if any major structural deterioration or defects exist that will prove cost-prohibitive for <br />renovations into Office / Meeting spaces. <br />In addition, YCH Architects will utilize a General Contractor licensed in North Carolina - CM Black Construction - to <br />remove certain interior wall, ceiling and floor finishes to expose structural conditions within the building. Due to the <br />extensive vandalism that has previously occurred, these alfected areas of demolition will not be patched or replaced <br />and left as demolished. Although we have a general idea of the construction methods and materials utilized within <br />the building, most of the structural framing is covered and not exposed. Therefore, the complete extent of work for <br />the General Contractor will not be known until demolition occurs. <br />Should any services be required or desired in addition to the above Scope of Work, then these can be provided on <br />an Hourly Rate Basis or as otherwise negotiated at the time of the request. <br />STANDARD OF CARE <br />Our firm will provide services as is consistent with other Professionals who practice architecture and provide <br />services for similar projects. We will utilize current National, State, and other applicable Codes as may be <br />appropriate in this investigation. <br />PBgB 1 Of 3 ~ E9atlmin\YATES~Z006\26005.00\Struct Services ~ Bethel School.wptl <br />~~ / <br />145 Union Street South u Concord, NC 28025 a Tel 704.788.2000 a fax 704.788.2010 ~ www.ycharch.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.