My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 11 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 11 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:38 PM
Creation date
11/27/2017 11:32:05 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/19/2007
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA Document G606q" - 2000 <br />Amendment to the Professional Services Agreement <br />T0: Mike Downs <br />(O]1•ner's Rapresanrntive) <br />In accordance with the Agreement dated: August 26, 2004 <br />BETWEEN the Owner: <br />Cabarrus County <br />6i Church Street SE <br />P. O. Box 707 <br />Concord, NC 28026-0707 <br />and the Architect <br />Ware Bonsall Archi[ects, inc. <br />10710 Sikes Place, Suite l25 <br />Charlotte, NC 28277 <br />for the Project: <br />(Name and address) <br />Cabarrus County Law Enforcement Center <br />Concord, NC <br />Authorization is reques[ed <br />®to proceed with Additional Services or a Change in Services. <br />^ to incur Additional Reimbursable Expenses. <br />Amendment Number: 0 t I <br />As Follows: <br />I. Architectural modifications and enhancements to the exterior design of the Housing Building, based on the <br />compromise reached between [he County and the City of Concord, m comply with the [elms of the Conditional Use <br />Permit. Modifications to the design included changing exterior wall material from precast concrete to brick, <br />developing articulated brick paltems on the building and changing the material of the Connector from metal panels <br />to Glass Fiber Reinforced Concrete (GFRC) panels. Thirty-five sheets of revised drawings include building <br />elevations, building sections, wall sections, wall and window details, floor plans and enlarged floor plans: <br />2. Civil Engineering scope changes associated with si[e permitting by NCDENR and the City of Concord including <br />water and sewer, erosion control, curbs along Corban Avenue and parking lot grading revisions. <br />The following adjustments shall be made to compensa[ion and [ime. <br />(insert provisions in accordance with the dgreemen6 or as otherwise agreed by the parties.) <br />Compensation: <br />Stipulated Sum as follows: <br />I. Architecture) Services: S 6),600.00 <br />2. Civil Engineering Services: S 12,000.00 <br />Total: S 71,600.00 <br />Time: <br />No change <br />sin gpOVaenc O90i` - 1000. CopY:Ignt ^x901 ny me merlon meelcucs or arenlcecr9. alt rigncs roeen9a. rexx]ac. rnu au poruoent <br />t[ vromua OY V.3. ^•npyrr9ne wx ana Ineera:etonLL reutlu. unrvtne[tue r.Oreauction ec at.trtbutton oC lair nxA oocwmt. er anY <br />pevrlon oe tr, n.y nsalr In severe elvsi SnO <rtninel psnelclu. SM KIl ne pr0e9cucaa :> eM n9xfnwn eaceut Dos9ln In un•tac the 4+. <br />Tait are C[ va9 proaOCta ny r.G r0[tre[e 1[ 16:31,]9 00 06/]9/1006 VMa[ 6ra0i No.3000]>lJ)6 1 „n icn .%pl [e9 On 6/!/9001, ana ii nOG COr <br />oelle' (]HIge99te1 <br />Vue 4ete9i <br />~r.... <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.