Laserfiche WebLink
<br />Arena and Events Center <br /> <br />Reoairs/Uofits needed: <br /> <br />1. Replace HV AC unit at Fair Office: <br />2. Install additional lighting on midway: <br />3. Repair cracked concrete/abate safety problems: <br />4. Repair roofleaks in Cabarrus Arena building: <br />5. Repair roofleak/water damage in Gold Hall: <br />6. Create additional enclosed storage/office space in Arena: <br /> <br />Total <br /> <br />F-5 <br /> <br />4,800.00 <br />2,000.00 <br />18,000.00 <br />5,000.00 <br />10,000.00 <br />20,000.00 <br /> <br />59,800.00 <br />