My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 09 25 Regular
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 09 25 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:17:14 PM
Creation date
11/27/2017 11:33:55 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
9/25/2006
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.t'age ! at I <br /> <br />Simaan, Leila E. - (CHA) <br /> <br />From: ,slmaan. Leila E. - (CHA) <br />Sent: Friday. August 04, 2006 8: 15 AM <br />To: Simaan, Leila E, - (CHA) <br />Subject: FW: RFP -005 -,bulle!in drawing REV3-S-01 <br /> <br />peo <br /> <br />H <br />;tf ....JJ I 0 <br /> <br />From: David Russell [mailto:drussell@hallcontracting.comj <br />Sent: Thursday, August 03, 2006 4:22 PM <br />To: Simaan, Leila E. - (CHA) <br />ee: Jeff Haddix <br />Subject: RE: RFP -005 - bulletin drawing REV3-S-01 <br /> <br />Leila, <br /> <br />The price to install 94 LF of masonry footing and 61 LF of 8'_4" wide side walk as shown in detail 3A-S3.4 is <br />$6.229.00 <br /> <br />Labor $1.755 <br />Permanent materials $3,178(+-.3 tons of reinforcing. 21 CY concrete. 10 tons gravel) <br />Equipment $1,233 (equipmeht, forms, snow fence & stakes) <br />Bond $63 <br /> <br />Clarifications I Exclusions <br /> <br />1. No soil treatment <br />2. No vapot barrier under walk <br />3. Top of masonry footing to be 709.86 with no steps <br />4. No stone under walk or masonry footing <br />5. Price does not include a remob fee for returning to pour the walk due the mason not laying the two courses <br />of block when requested by Hall <br />6. Price includes Y!' expansion joint material along each side of the walk. <br />7. Price excludes joint a~d expansion joint sealants. <br />8. There are no steps in the walk. <br />9. Back fill along block u~der wail to be with gravel. <br />10. No speclai finishes or colors. <br />11. The last +-33 LF of footing to be left open for use by others. Price includes install snow fence to along this <br />area for safety. <br />12.. Excludes all other war not specifically described in this email. <br /> <br />Thanks, <br />David <br /> <br />F-~ <br /> <br />8/4/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.