<br />3) ATC '-ab To date (2) invoices have been received, one for <br />$2,148.50 and one for $1,926.25. Total lab costs = $4,074.75 <br />Amend 22 included $3,570 in lab costs. <br />Difference = ~ <br /> <br />4) Additional costs associated with installing CD.4 on 8/7/06 <br />separate from other MW's to address MSW waste. <br />a) Lab 48 hr. TAT = $200 <br />b) Mobilization = WQ <br />Total i.Q.QQ <br />~: Labor, direct expenses, trip cost & lab costs <br />included under original Amend 20) <br /> <br />B.~ <br />. . 1) NCDENR SWS may require (2) additional M'/IJ's be installed <br />to address the waste discovered in the road realignment area. <br />a) Mobilization Est. $800 <br />b) Drilling (2) MW's Est. $5,000 <br />c) L~b/Analytical (2) Samples Est. $1,000 (48 hr. TAT) <br />d) COM Field Time (Labor) Est. $3,750 <br />e) Additional Survey Est. $1,200 <br />f) COM Direct Expenses Est. $925 <br />g) COM Report (Labor) ~ <br />Total Est. .$13.550 <br /> <br />2) ResRonse to SWS comments/SWS review of MSW waste <br />inve$tigation report + follow up report/submittals by CDM. <br />Est. .$2.500 <br /> <br />_ _L '1011''Z~ <br />A = Est. $1Pr9'44.75 '" I <br />B = Est. $1a,050.00 <br /> <br />A + B = Est; $~75 + 5% Contingency = 3~se(4i <br />u%sz.1.<' 1 r/, ~fJ'.'l..' <br />Sav $33,60Q..(Estimate of additional + projected costs) <br />~: Actual costs will be based on what will be required by the SWS. <br />Only actual costs would be invoiced) <br /> <br />{'-3 <br />