Laserfiche WebLink
<br /> <br />(,:Y:J:Y.." <br /> <br />" : ,', ,':~ ,." <br /> <br />""/.' <br /> <br />:.,:'(.-....- <br /> <br />':?:r>?' '-"':--;,,:->,-.,;.'; <br /> <br />.;'" <br /> <br />Rocky River Phase III Softball <br />October 13, 2006 <br /> <br />Musco Equipment Description <br />Light-Structure Green ™ System delivered to your site in Five Easy Pieces ™ <br />. Pre-cast concrete bases <br />. Galvanized steel poles <br />. UL Listed remote electricai component enclosure <br />. Pole length wire harness <br />. Factory-aimed and assembled luminaires <br />Also Includes: <br />. Energy savings of more than 50% over a standard lighting system <br />. 50% less spill and glare light than Musco's prior industry leading technology <br />. Musco Constant 25™ warranty and maintenance program that eliminates 1 00% of your maintenance <br />costs for 25 years, including labor and materials <br />. Guaranteed constant light leveis of 50 footcandles infield and 30 footcandles outfield for 25 years, +/- 10% <br />per iESNA RP-06-01 <br />. One group re-Iamp at the end of the lamps' rated life, 5000 hours <br />. Control Link,. Control & Monitoring System for flexible control and solid management of your lighting <br />system <br />. Lighting Contactors sized for voltage and phase of the fields. <br /> <br />Turnkev Installation <br /> <br />. Estimate includes unloading of Musco equipment at the site, assembly of Musco equipment, all pole <br />wiring, installation of the pre-stress concrete foundations with concrete backfill, and standing of the new <br />poles. <br />. Estimate includes adding Control Link controls to Fields #1, #2, #3, #4 and #5. <br /> <br />. Licensed North Caroiina contractor to install (1) 400 watt power flood security light on 3 poies which will be <br />controlled by a time clock. <br /> <br />. Contractor to wire poles using direct burial copper USE wire. <br /> <br />. Estimate includes installation of branch circuits from main panel to each new pole location. <br />. Rock, bottomless, wet, or unsuitable soils that may be encountered while digging which may require <br />additional engineering or special installation methods. <br />. Wire prices based as if May 9, 2006 and will be revised at time of purchase. <br /> <br />Quote For Musco Materials including Installation <br /> <br />Musco's Light Structure Green™ as described above, delivered and Installed atthe job slle for $119,000 . <br /> <br />Sales tax is not included as part of this budget estimate. <br /> <br />Pricing furnished Is effective for 60 days unless otherwise noted and Is considered confidential. <br /> <br />~- \ \ <br />