My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 11 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 11 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2006 5:16:06 PM
Creation date
11/27/2017 11:34:12 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/20/2006
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Delivery to the job site from the time of order, submittal approval, and confirmation of order details <br />including voltage and phase, pole locations is approximately 30-45 days. Due to the built-in custom light <br />control per luminaire, pole locations need to be confirmed prior to production. Changes to pole locations <br />after the product is sent to production could result in additional charges. <br /> <br />Notes <br />Estimate is based on: <br />. Shipment of entire project together to one location <br />. Field size of 200'/200'/165' and 165'/200'/200' for Softball with common B poles <br />. Structural code and wind speed = 2000 IBC-C, 90 MPH . <br />. Confirmation of pole locations prior to production <br /> <br />Thank you for considering Musco for your sports-lighting needs. Please contact me with any questions. <br /> <br />Dina Neeley <br />Sales Representative <br />Musco Lighting <br />Phone: 336-414-1030 <br />E-mail: dina.neeley@musco.com <br />Fax: 336-887-0771 <br /> <br />~-\\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.