My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 01 10
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 01 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:34:23 AM
Creation date
11/27/2017 11:34:30 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/10/2005
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roof: 10" galvanized cold rolled sections, 24: o.c., with purlins. Metal roofmg to match <br />existing building. R-30 fiberglass blanket insulation wi plastic vapor barrier. Metal gutter <br />and downspouts to splash blocks on grade. <br />Finishes: <br />1. Non-slip, anti-microbial epoxy floor coating <br />2. Epoxy wall coating or glazed masonry units. <br />3. Epoxy painted Hardiboard. <br />Fixtures: <br />1. . Detention grade 'shower fixture ( one per eight inmates) <br />2. Stainless steel water closet (one per eight inmates) <br />3. Stainless steel lavatories (one per eight inmates) <br />4. Dual height drinking fountains (one pair per dayroom) <br />5. Gas water heaters,. separate for each dayroom <br />6. Mopsink, one in each janitor's closet <br />7. Accessible shower controls <br />Toilet Accessories, all detention grade <br />1. Stainless steel mirrors <br />2. . Soap dispensers. <br />3. Paper towel dispensers <br />4. Trash receptacles <br />5. Toilet paper holders <br />6. Grab bars <br />7. Collapsible Towel Hooks <br />Holding Cells: dry cells <br />Single Segregation cells: One per dayroom, Combination fixture, <br /> <br />Integrated Security Electronics: <br />Access Controls: Card readers wi key overrides <br />Intercoms <br />Paging <br />CCTV/DVD/motion detection recording <br />Guard Tour <br />Duress System <br />Inmate Management <br />Integrated with Fire Alarm <br />Cost: $88,000 <br /> <br />Systems Estimate: <br /> <br />Add 32-bed dayroom walls, doors, toilets <br />Add 32-bed dayroom walls, doors, toilets <br />Add 24-bed dayroom walls, doors, toilets <br />Add Control Room <br />Add Sallyport <br />Miscellaneous Office renovations <br />Furnishings (reusable) <br /> <br />j <br /> <br />$118,000 <br />$118,000 <br />$ 89,000 <br />$69,000 <br />$ 18,000 <br />$ 15,000 . <br />$ 58,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.