Laserfiche WebLink
<br />Holding Cells (2) <br />Security Electronics <br />Modifications to Fire Protection System (sprinklers) <br />Modifications to Fire Alarm <br />Additional Electrical <br />Additional Fencing <br />New HV AC (40 tons est.) <br /> <br />$ 30,000 <br />$ 88,000 <br />$ 20,000 <br />$ 10,000 <br />$ 30,000 <br />$ 30,000 <br />$ 92.000 <br /> <br />Subtotal <br />10% Contingency <br /> <br />$785,000 <br />$ 79.000 <br /> <br />Construction Total <br /> <br />$864,000 <br /> <br />Other Costs: <br />Building Lease <br />Demo1ition/Repair at the end of the Lease <br />Professional Fees / Testing <br /> <br />$180,000 <br />$ 50,000 <br />$120.000 <br /> <br />Project Total <br />$91.28 per square foot <br />$13,796.45 per bed <br /> <br />$1,214,000 <br /> <br />3 <br />