My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 05 23
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 05 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:35:05 AM
Creation date
11/27/2017 11:35:21 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/23/2005
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-AVA <br />NCDENR <br />North Carolina Department of Environment and Natural Resources <br /> <br />Michael F. Easley, Governor <br />William G. Ross Jr., Secretary <br /> <br />Division of Waste ManageIl).ent <br />Underground Storage Tank Section <br /> <br />Dexter R. Matthews, Director <br /> <br />April 20, 2005 <br /> <br />CERTIFIED MAIL CM # 7003 2260 0001 3550 6637 <br />RETURN RECEIPT REQUESTED <br /> <br />Mr. John Page <br />Cabarrus County General Services <br />POBox 707 <br />Concord, NC 28026 <br /> <br />Re.: Notice of Violation of <br />15A NCAC 2L .0115(c) <br />Risk-based Assessment and Corrective Action <br />for Petroleum Underground Storage Tanks <br /> <br />Cabarrus County Services Building <br />53 Corban Avenue <br />Cabarrus County <br />Incident number: 12408 <br />Risk Classification: Unconfirmed <br /> <br />Dear Mr. Page: <br /> <br /> <br />Information received by this office on July I, 1994 confirms a release or discharge from a <br />petroleum underground storage tank (uST) system at the above-referenced location. Records indicate <br />that Cabarrus County General Services is the owner or operator of this UST system. You have failed to <br />comply with the release response and corrective action requirements of Title 15A NCAC 2L .01l5(c) by <br />submitting a complete PhaseULirnited Site Assessment Report within the time frame specified in a <br />September 14, 2004 correspondence from this office. <br /> <br />Please report to the Mobresville Regional Office the actions taken to bring the site into <br />compliance within 30 days from the date of this notice to avoid recommendation of civil penalties for <br />continuing violations. <br /> <br />Penalties may be assessed for the violation described within this Notice of Violation. Your <br />prompt attention to the items described herein is required. Failure to comply with the State's rules, in the <br />manner and time specified, may result in the assessment of additional civil penalties and/or the use of <br />other enforcement mechanisms available to the State. Each day that a violation continues may be <br />considered a separate violation. <br /> <br />Because a release or discharge has been confirmed, a Licensed Geologist or a Professional <br />Engineer, certified by the State of North Carolina, is required to prepare and certifY <br />all reports submitted to the Department in accordance with Title 15A NCAC 2L .0 I 03( e) and 2L <br />.Olll(b). <br /> <br />F-'J.7 <br /> <br />An Equal Opportunity f Affinnative Action Employer. 50 % Recycled \ 10 % Post Consumer Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.