My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 07 14
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 07 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:35:25 AM
Creation date
11/27/2017 11:35:53 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
7/14/2005
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Preliminary Cost Estimates for New Athletic Facilities <br />At Harris Road School/Park <br /> <br />Includes completion of <br />2 - 200' Baseball/Softball Fields <br />1 . 250' Baseball Field <br />1 - Regulation (160' x 320') Soccer Field <br />Restrooms/Concession/Storage Building <br /> <br />1. Fencing <br />(200' Field) <br />(250' Field) <br /> <br />Subtotal <br />Planning/Engineering (100io) <br />Contingency (5%) <br />Preliminary Total <br /> <br />$40,000 . <br />22,000 <br /> <br />20,000 <br /> <br />16,500 <br /> <br />15,000 . <br />8,500 <br />12,500 <br />25,000 <br /> <br />7,000 <br />4,500 <br />7,500 <br /> <br />40,000 <br />16,000 <br /> <br />108,000 <br />72,000 <br />72,000 <br />15,000 <br /> <br />3,600 <br />250,000 <br />10,000 <br />$765,100 <br />76,510 <br />38.25-5 <br />$ 879,865 * <br /> <br />$20,000 each x 2 fields <br />22,000 each x 1 field <br /> <br />2. Foul Ball Netting <br />3. Dugouts/Concrete Floor/Elenches <br />3 fields x $5,500 <br />4. Irrigation System <br />(200' Field) $7,500 each x 2 fields <br />(250' Field) 8,500 each x 1 field <br />(Soccer Field) 12,500 each x 1 field <br />5. Well/Pump/Storage Tank for Irrigation System <br />6. Bermuda Sprigging <br />(200' Field) <br />(250' Field) <br />(Soccer Field) <br />7. Bleachers <br />8 sets (5 rows x 21'long) x $5,000 each <br />Concrete Pads 8 x $2,000 each <br />8. Lighting System <br />(200' Field) $54,000 each x 2 fields <br />(250' Field) 72,000 each x 1 field <br />(Soccer Field) 72.000 each x 1 field <br />9. Electrical/Water/Sewer Connection Expense <br />10. Infield Preparation (Bases & infield Dirt) <br />3 fields x $1,200 per field <br />11. Restrooms/Concession/Storage Building <br />12. Signage <br /> <br />$3,500 each x 2 fields <br />4,500 each x 1 field <br />7,500 each x 1 field <br /> <br />* Cost does not include any grading (rough or fine), accessible routes <br />(sidewalks/ramps), soil improvement items for Bermuda turfing or turf improvements to <br />area outside athletic fields. <br /> <br />Date: July 11, 2005 <br /> <br />Gr~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.