My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 10 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 10 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:33:58 AM
Creation date
11/27/2017 11:36:24 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/17/2005
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />09(09(2005 16;05 FAX t04 721 6581 <br /> <br />WAUcK <br /> <br />lQ;lVVO/VVO <br /> <br />; <br />I <br />I <br /> <br />FORM OF l'ROPOSAL <br /> <br />Name of Company <br /> <br />R, J. Fisher Construction Co" Inc. <br /> <br />Business Address <br /> <br />400 Penny Lane, NE, Concord, NC 28025 <br /> <br />License No. (STATE) <br /> <br />19038 (NC) <br /> <br />Date 9-29-05 <br /> <br />PROPOSAL FOR: <br /> <br />Cabarrus County Solid Waste Maintenance Garage <br />4441 Irish Potalo Road Concord, North Carolina <br /> <br />Gentlemen: <br /> <br />The undersigned bidder, having carefully examined the Bidding Requirements, <br />ConstruCtion Documents, and all subsequent Addenda as prepared by Barbara 1. Walker <br />Architecture. Inc., visited the site, and being fanliliar with aU conditions and requirements <br />of the Work, hereby agree to furnish all matelial, labor, equipment (other than <br />specifically noted), and services for a complete and functioning installation of the above. <br /> <br />BASE BID $ Two Hundred Seventy Three <br />Hundred ($273,200.00) <br />Thc Work will be completed in 120 <br /> <br />Thousand Two <br /> <br />dollars. <br /> <br />days after Notice to Proceed. <br /> <br />The Contractor proposes to use the foilowing subcontractors for the respective trades and <br />the sum cost as listed: . <br /> <br />Phul1bing Sllbcontractor: Cain I s Plumbing <br /> <br />. BY AC Subcontractor: Air Repair <br /> <br />$ 12,160.00 <br />$ 13,385.00 <br /> <br />Electrical Subcontractor: Hinson Electric <br /> <br />$ 19,975.00 <br /> <br />AddcIlda have been received as follows (if applicable): <br /> <br />Addendum No. <br /> <br />1 <br /> <br />Date Sept. 19. 200<; <br /> <br />Addendum No. Date <br /> <br />Memo dated September 16, 2005 <br /> <br />/ <br /> <br />F-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.