Laserfiche WebLink
<br />V;j/vtJ/l.l,ll,lO ItS.V;I ri"lA .l.,I" II.I 0 01 <br /> <br />IIn~I'~11 <br /> <br />lJ},1T COSTS: <br />#1 _ 4" PVC sewer line to septic tank location fron. 5' oLLtside building. <br />#2... 1" copper water lin,e to wc111ocation from 5' outside building. <br /> <br />BID BO)lD: No Bid Bqnd is required of the General Contractor. <br />Jf <br /> <br />$I2.00/L,F, <br />$IO.OO!L.F. <br /> <br /> <br />, " '.' '. <br /> <br />FORM OF PROPOSAL <br /> <br />ALLOWANCES: <br />(A/ltlcllmilll aJ lI.ctlJary) <br /> <br />Soils Testing <br /> <br />$3,500.00 <br /> <br />ALTERNATES: . <br />. (AtlOclmlflll (I,f l'>er~$u'ry) <br /> <br />*~ (See Below) <br /> <br /> <br />R, J. Fisher Construction Co., Inc. <br /> <br />By: <br /> <br />Title: President. <br /> <br />Dato proposal execuied~ <br /> <br />September 29, 2005 <br /> <br />Sptcial note:lfflrm maklllg fhis bId 1$ Ii1corporored, a({(fch Iheseal o/the CO~pMllion to this sheet. <br /> <br />** List of Alternates <br />, <br />i <br />Alt, /11: Use wooditrusses in lieu o~ steel Joists for mezzanine <br />framing. I <br /> <br />Deduct $110,00 <br /> <br />Alt. #2: Add electronic control for door #10. <br />Add .$1,530.00 <br />Alt, ./13: Design m~tal building to. support loads for a 7.5 to bridge <br />, <br />crane. F <br /> <br />Add $I, 630,00 <br /> <br />Alt, #4: Deduct p~rmits, <br /> <br />DedUct $920.00 <br /> <br />/V-4 <br />\ <br />