My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 10 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 10 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:33:58 AM
Creation date
11/27/2017 11:36:24 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/17/2005
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />08/30/2005 13:24 FAX 704 721 8581 <br /> <br />WALKER <br /> <br />~ 002/003 <br /> <br />FORM OF PROPOSAL <br /> <br />Name of Company LaFave's ConstJUction Companv, Inc. <br /> <br />Business Address. P.O. Drawer 8146.100 Cold Water Street, Landis. NC 28088 <br /> <br />License No.(STATE) 29071 NC <br /> <br />Date September 29. 2005 <br /> <br />PROPOSAL FOR: <br /> <br />Cabamls County Solid Waste Maintenance Garage <br />4441 Irish Potato Road Concord, North Carolina <br /> <br />Gentlemen: <br /> <br />Thc undcrsigned bidder, having carefully examined the Bidding Requirements, <br />Construction Documents, and all subsequent Addenda as prepared by Barbara 1. Walker <br />Architecture, Inc., visited the site, and being familiar with all conditions and requirements <br />of the Work, hereby agree to furnish all material, labor, equipment (other than <br />specifically noted), and services for a complete and f\lllctioning installation of the above. <br /> <br />BASE BID $ 294,487.00 <br />Two hundred ninety-four thousand, four hundred eighty-seven and 00/100 dollars. <br /> <br />The Work will be completed in 150 days after Notice to Proceed. <br /> <br />Thc Contractor proposes to use the following subcontractors for the respective trades and <br />the sum cost as listed: <br /> <br />Plumbing Subcontractor: Kannapolis Service Co. <br /> <br />HV AC Subcontractor: Delwood Mechanical <br /> <br />Electrical Subcontractor: Hinson Electrical Contractors <br /> <br />Addenda have been received as follows (if applicable): <br /> <br />Addendum No. One <br /> <br />Date 9/19/05 <br /> <br />Addendum No. <br /> <br />Datc <br /> <br />ALLOWANCES: <br /> <br />Soil Testini! <br /> <br />$3,500.00 <br /> <br />Three thousand, five hlmdred and 001100. <br /> <br />\ <br />F-Y- <br />
The URL can be used to link to this page
Your browser does not support the video tag.