My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 12 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 12 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:34:20 AM
Creation date
11/27/2017 11:36:48 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/19/2005
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... <br /> <br />FENTON T. ERWIN, JR, <br />email: felwin@eelaw.net <br /> <br />ERWIN AND ELEAZER, P.A. <br /> <br />ATIORNEYS AT LAw <br />83 I East Motehead Street, Suite 840 <br />Charlotte, North Carolina 28202-2726 <br /> <br />Telephone (704) 369-7900 <br />Facsimile (704) 335-5433 <br /> <br />December 13, 2005 <br /> <br />Via emai/: iddav(fD.cabarruscountv.us <br />Mr. John Day <br />County Manager <br />Cabarrus County <br />Post Office Box 707 <br />Concord, NC 28026 <br /> <br />Re: Contract for Cabarrus County Jail and Sheriff's Department <br /> <br />Dear John: <br /> <br />To follow as attachments is the Contract for Construction Manager at Risk and <br />the General Conditions of the Contract. I am also faxing a copy to Fletcher Hartsell <br />and to Bob Burchette. <br /> <br />Although the State Construction Manager Contract at Risk documents do not <br />provide for "phased" construction, I have used those documents as an outline/model <br />in putting together the two documents which follow. <br /> <br />I have used a considerable number of assumptions in creating the "phased" <br />construction process. <br /> <br />In a nutshell, before construction begins Turner will: <br /> <br />. Pre-qualify, with Cabarrus County, contractors allowed to bid; <br />. Exercise good faith efforts to engage Cabarrus County subcontractors; <br />. Meet statutory compliance for use of minority businesses; <br />. Publicly advertise bids; <br />. Award subcontracts; <br />. Propose Guaranteed Maximum Price; <br /> <br />EE:00050594. <br /> <br />F.i- <br />
The URL can be used to link to this page
Your browser does not support the video tag.