Laserfiche WebLink
~ Water & Sewer Authority of Cabarrus County <br />V~-'~CC Water and Wastewater System Master Plan <br /> <br />Safe Yield Update and Regional Drought Operations <br /> <br />862 <br />650 <br />648 <br /> <br />846 <br /> <br />844 <br /> <br />630 <br /> <br />628 <br /> <br />Figure 7. Lake Howell stage during the 103 years of simulated record at the 50-yr safe yield (I 6.2 mgd) <br /> <br /> 728 <br /> <br />726 <br /> <br /> 724 <br /> <br /> 722 <br /> <br /> 720 <br />~718 <br /> <br />718 <br /> <br />714 <br /> <br />712 <br /> <br />710 <br /> <br />Figure 8. Kannapolis Lake stage during the 103 years of simulated record at the $0-yr safe yield (8.5 mgd) <br /> <br />PN 096873.0800 10 <br />January 23, 2004 BLACK & VEATCH <br /> .. International Company <br /> <br /> <br />