Laserfiche WebLink
~ Water & Sewer, Authority of Cabarrus County <br />WSACC Water and Wastewater System Master Plan <br /> <br />Safe Yield Update and Regional Drought Operations <br /> <br />644 <br />642 <br />640 <br />638 <br /> <br />632 <br /> <br />830 <br /> <br />628 <br /> <br />F~gure 9. Lake Fisher stage during the 103 years of simulated record at the 50-yr safe yield (5.15 mgd) <br /> <br /> 660 <br /> <br /> 05tt <br /> <br /> 654 <br /> <br />652 <br /> <br />650 <br /> <br />548 <br /> <br />646 <br /> <br />644 <br /> <br />642 <br /> <br />640 <br /> <br />Figure 10. Lake Concord stage during the 103 years of simulated record at the 50-yr safe yield (1.2 mgd) <br /> <br /> 1 <br />PN 096873.0800 <br />January 23, 2004 BLACK & VEATCH <br /> ~,. ~, ~ International Company <br /> <br /> <br />