My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2004 08 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2004
>
AG 2004 08 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2006 9:20:20 PM
Creation date
11/27/2017 11:38:49 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/16/2004
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 26, 2004 Page 575 <br /> <br />(F-17) Revise~ Construction Brands=ds Pee S=hedule <br /> <br /> The fee schedule for Construction Standards was amended in May with an <br />effective date of July 1, 2004. The implementation of the new schedule <br />revealed inconsistencies between some of the specific schedules and some <br />minor items were not covered. The proposed revisions will eliminate those <br />inconsistencies and address the additional permit types that have been <br />identified. <br /> <br /> U~ON MOTION of Commissioner Carpenter, seconded by Acting Chairman <br />Carruth and unanimously carried, the Board adopted the following fee <br />schedules for Construction Standards effective July 1, 2004: <br /> <br /> CABARRUS COUNTY CONSTRUCTION STANDA~DS <br /> FEE SCHEDULBS <br /> EFFECTIVE JULY 1, 2004 <br /> <br />SCHEDULE A - N~W CONSTRUCTION <br /> <br />General <br /> Value of Construction <br /> <br />Permit Fee <br /> <br />$ 0- $15,000 $ 75.00 <br />15,001 - 25,000 113.00 <br />25,001 ° 40,000 176.00 <br />40,001 - 50,000 218.00 <br /> <br />Estimated construction cost above $50,000 will be charged an <br />additional $3.00 per additional $1,000.00 building value. <br /> <br />*Estimated cost for residential construction will be based on the <br />total cost of construction or $55.00 per square foot of heated <br />space and $25.00 per square foot of unheated space whichever is <br />greater. A $10.00 surcharge will be added to these permits as <br />required by the "Homeowners Recovery Fund". <br /> <br />Other new construction fees: <br /> <br />Mobile Home $100.00 <br />Daycare/Group Care/Foster Care Home Inspection $100.00 <br />Temporary Construction Trailer Permit $100.00 <br />Replacement Building Permit Cards $ 3.00 <br /> <br />PLAN REVIEW A/qD GENERAL POLICY <br /> <br />Plan Review - $50.00 base fee plus .03/square foot <br /> <br />Callback Fee - A $50.00 callback fee will be charged for re- <br />inspection for any return trip to a site due to owner, contractor <br />or sub-contractor being unprepared for the original inspection. <br /> <br />Other building permit fees: <br /> <br />~pecial event tents (for religious~ exhibitionf political, <br />secularf anlusement or commercial purposes) - $25.00 per tent. <br /> <br />Certificat~ of Occupancy for Existing Buildings - ~20.00. <br />(For businesses who locate in an existinq commercial buildinq <br /> <br />where no construction occurs in preparation to operate <br />business. This Certificate of Occupancy shall be issued only <br />after approval from the applicable zon~-q~ buildin~ inspectionf <br />fire, heplth~ engineering and state agencies havinq <br />Jurisdiction). <br /> <br />SCHEDULE B <br /> <br />Building permit for the alteration, demolition, remodel, removal, <br />repair, re-roofing, or reconstruction of any structure. This <br />schedule also applies to accessory buildings. <br /> <br />Value of Construction <br /> <br />Permit Fee <br /> <br />$ 0 - $ 1,000 $25.00 <br />1,001 - 5,000 35.00 <br />5,001 - 15,000 75.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.