Laserfiche WebLink
July 26, 2004 <br /> <br />Page <br /> <br />Estimated construction cost above $15,000 will be charged an <br />additional $3.00 per additional $1,000 value. <br /> <br />Callback Fee - A $50.00 callback fee will be charged for re- <br />inspection for any return trip to a site due to owner, contractor <br />or sub-contractor being unprepared for the original inspection. <br /> <br />MECF~NICAL PERMITS <br /> <br /> UNIT/FIXTURE DESCRIPTION FEES <br /> <br />A/C Units - i hp to 5 hp <br />Greater than 5 hp constitutes <br />an additional unit $35.00 <br />Heating Units - 0 to 150,000 btu <br />Greater than 150,000 btu constitutes <br />an additional unit $35.00 <br />Gas Piping $25.00 <br />Boilers (150,000) $25.00 <br />Thru-wall heating and cooling units $25.00 <br />Wall furnace, Floor furnace, and <br />Unit Heaters $25.00 <br />Commercial Fnchaust Hoods $50.00 <br />Commercial Dryers $50.00 <br />Replace Heating 0 (150,000-5t) <br />(no duct work) $25.00 <br />Cooling $25.00 <br />Fan Coil (Heating and/or Cooling) $25.00 <br />ConversIon Burner (150,000) $25.00 <br />Refrigeration $50.00 <br />Duct Work $25.00 <br />Replace heat $25.00 <br />Replace air $25.00 <br /> <br />There will be a $50.00 callback or re-inspection fee charged for <br />any return trip to a job site if the contractor, subcontractor, <br />or owner is at fault. <br /> <br />All commercial mechanical permits for new construction or new <br />projects shall be calculated using the Construction Schedule A, <br /> <br />576 <br /> <br />when BTUs (tons) are not applicable. When BTUs (tons) ar- <br />applicable, the Mechanical Permit fee schedule shall apply. <br /> <br />All commercial mechanical permits for existin9 buildings, or for <br />projects where any previous construction has occurred, or for tb~ <br />alteration demolition, remodel, removal, repair, re-roofing, <br />upfit~ o~ reconstruction of any commercial structure or project, <br />shall be calculated usinq the Construction Schedule B. <br /> <br />ELECTRICAL AND MOBILE HOME PERMITS <br /> <br />SIZE OR ~fPE OF SERVICE <br />60 Ampere Service <br />100 Ampere Service <br />125 Ampere Service <br />150 ~unpere Service <br />200 Ampere Service <br />225 Ampere Service <br />250 Ampere Service <br />275 Ampere Service <br />300 Ampere Service <br />325 Ampere Service <br />350 Ampere Service <br />400 Ampere Service <br />Saw Service <br />Pools, Grounding and Wiring <br />Well Services and Signs <br />Change of Service <br /> Up to 200 amps service. <br /> Above 200 amps is based on size of service <br />HVAC Wiring <br /> <br /> FEES <br />$40.00 <br />$40.00 <br />$4o.oo <br />$45.00 <br />$S5.00 <br />$65.00 <br />$75.00 <br />Sa0.00 <br />$85.00 <br />$90.00 <br />$90.00 <br />$120.00 <br />$40.00 <br />$40.00 <br />840.00 <br />$40.00 <br /> <br />$40.00 <br /> <br /> <br />