Laserfiche WebLink
~TEM <br /> <br /> PRELIMINARY CONSTRUCTION COST ESTIMATE FOR <br /> CABARRUS COUNTY EXPO-MIDWAY PAVEMENT <br />NOTE: ESTIMATE PREPARED WITHOUT PLANS (SKETCH ONLY) <br /> 02-January-2003 <br /> QUANTITY UNIT UNIT <br /> PR/CE COST <br /> <br />1. Clearing (*cannot be burned) <br /> Total 0 Ac $5,500.00/Ac $0.00 <br /> <br />2. Grading <br /> Strip existing grass/haul off 1,750 Cy $3.00 ICy $5,250.00 <br /> <br />Sanitary sewer <br />pipe (0'-6') 600 Lf $28.00/Lf $16,800.00 <br />manholes (0'-6') 3 Ea $1,500.00 ea $4,500.00 <br />Connection to existing sewer 1 Ea $3,000.00 ea $3,000.00 <br />Testing 1 Ea $1,000.00 ea $1,000.00 <br />Services 0 Ea $350.00 ea $0.00 <br /> <br />4. Midway <br />stone base (6") / asphalt (2") 5,255 Sy <br />fine grade road 5,255 Sy <br /> <br />5. Curb and gutter (24" valley) 0 Lf <br /> Backfill Edge of Paving & Clean-up 2,178 Lf <br /> <br />6. 5' Sidewalk 0 Lf <br />7. Seeding around pavement 1 Ac <br />8. Erosion control (7.5% of total) <br />9. Rock Allowance 0 Cy <br /> <br />10. Contingency - 10% <br /> <br /> $10.75/Sy $56,491.25 <br /> $1.00/Sy $5,255.00 <br /> <br /> $8.50/Lf $0.00 <br /> $1.00/Lf $2,178.00 <br /> <br />$12.25/Lf $0.00 <br />$1,500.00/Ac $1,500.00 <br /> $7,086.00 <br />$60.00 ICy $0.00 <br />subtotal = $103,060.25 <br /> $10,306.03 <br />subtotal = $113,366.28 <br /> <br />Expo Midway Pavement.xls <br /> <br />lof2 <br /> <br /> <br />