My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 01 06 07
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 01 06 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:04 AM
Creation date
11/27/2017 11:39:58 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/6/2003
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOTAL ESTIMATE - <br /> <br />$113,366.28 <br /> <br />The construction estimate is based on current market values available for labor and products <br />as specified and may or may not be accurate at the time of construction. The estimate <br />reflects assumptions made by Engineer on types of material, depths, and capacities of <br />structures that are impossible to determine accurately without complete engineering plans <br />approved by the various local, state, and federal regulatory agencies and without complete <br />subsurface investigation to discover the presence of rock or unsuitable soil. This <br />construction estimate does not reflect costs associated with land acquisition, right-of-way <br />acquisition, interests costs, soft costs, fuel increases, increases in insurance costs, or costs <br />associated with unusual weather delays or unusual government review time. This estimate <br />assumes availability on site of sufficient quantities of suitable materials for construction. This <br />construction estimate is based upon preliminary quantities and unit prices from local <br />contractors. Therefore, we assume no responsibility and shall have no liability, <br />consequential or otherwise, between the <br />projected cost and the actual cost incurred due to the regulating authorities unanticipated <br />conditions, or changes in the owner's program or scope of services. <br /> <br />Expo Midway Pavement.xls <br /> <br />2 of 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.